Dell PowerStore 1200T EMC PowerStore Networking Guide for PowerStore T Models - Page 41

Prepare to con the switches and networks for Storage services

Page 41 highlights

9 Prepare to configure the switches and networks for Storage services This chapter includes the following information. Topics: • Switch resources for Storage services worksheet • Network configuration worksheet for Storage services Switch resources for Storage services worksheet Work with your network administrator to complete the Switch Resources for Storage services Worksheet and reserve the necessary resources to configure the two Top-of-Rack (ToR) switches required for Storage services. For a sample of a Switch Resources for Storage services Worksheet completed for Dell PowerSwitch Series see, Completed example of Switch resources for Storage services worksheet. NOTE: This section assumes you have completed initial deployment, and your Management switch and network have been successfully configured. Additionally, you may want to work with your network administrator to complete the Network configuration worksheet for Storage services at the same time, to reserve the necessary resources to create the Storage networks in PowerStore Manager. Table 15. Switch resources for Storage services worksheet (blank) Step Details Notes 1. Print this table to record the reserved resources. 2 Reserve and record the IP addresses necessary to configure the ToR switches below: Management IP address for ToR Switch 1 Management IP address for ToR Switch 2 Default gateway NTP server 3. As a best practice it is recommended to add a spanning tree protocol to the ToR switches. Record the spanning tree protocols to set on each switch. Spanning tree protocol for ToR Switch 1 Spanning tree protocol for ToR Switch 2 4. Choose which layer 2 interconnect you will configure between the switches. ● Highly Recommended: Direct interconnect using Multi-chassis Link Aggregation Group (MC-LAG) ● Direct Interconnect not using MC-LAG ● No direct interconnect between the switches If you will be using MC-LAG, record the ports you will use to connect the switches together. ToR Switch 1 to ToR Switch 2 port pair 1 ToR Switch 1 to ToR Switch 2 port pair 2 Prepare to configure the switches and networks for Storage services 41

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118

Prepare to configure the switches and
networks for Storage services
This chapter includes the following information.
Topics:
Switch resources for Storage services worksheet
Network configuration worksheet for Storage services
Switch resources for Storage services worksheet
Work with your network administrator to complete the
Switch Resources for Storage services Worksheet
and reserve the
necessary resources to configure the two Top-of-Rack (ToR) switches required for Storage services.
For a sample of a
Switch Resources for Storage services Worksheet
completed for Dell PowerSwitch Series see,
Completed
example of Switch resources for Storage services worksheet
.
NOTE:
This section assumes you have completed initial deployment, and your Management switch and network have been
successfully configured.
Additionally, you may want to work with your network administrator to complete the
Network configuration worksheet for
Storage services
at the same time, to reserve the necessary resources to create the Storage networks in PowerStore Manager.
Table 15. Switch resources for Storage services worksheet (blank)
Step
Details
Notes
1.
Print this table to record the reserved resources.
2
Reserve and record the IP addresses necessary to configure the ToR switches below:
Management IP address for ToR Switch 1
Management IP address for ToR Switch 2
Default gateway
NTP server
3.
As a best practice it is recommended to add a spanning tree protocol to the ToR switches.
Record the spanning tree protocols to set on each switch.
Spanning tree protocol for ToR Switch 1
Spanning tree protocol for ToR Switch 2
4.
Choose which layer 2 interconnect you will configure between the switches.
Highly Recommended
: Direct interconnect using Multi-chassis Link Aggregation Group (MC-LAG)
Direct Interconnect not using MC-LAG
No direct interconnect between the switches
If you will be using MC-LAG, record the ports you will
use to connect the switches together.
ToR Switch 1 to ToR Switch 2 port pair 1
ToR Switch 1 to ToR Switch 2 port pair 2
9
Prepare to configure the switches and networks for Storage services
41