Dell S5224F-ON EMC PowerSwitch S5200F-ON Series Installation Guide February 20 - Page 29
One-half U front-rack installation, Rack mount safety considerations
![]() |
View all Dell S5224F-ON manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 29 highlights
NOTE: The illustrations in this document are not intended to represent a specific switch. NOTE: Do not the use the mounted ReadyRails as a shelf or a workplace. Rack mount safety considerations ● Rack loading-Overloading or uneven loading of racks may result in shelf or rack failure, possibly damaging the equipment and causing personal injury. Stabilize racks in a permanent location before loading begins. Mount the components starting at the bottom of the rack, then work to the top. Do not exceed your rack's load rating. ● Power considerations-Connect only to the power source specified on the unit. When you install multiple electrical components in a rack, ensure that the total component power ratings do not exceed the circuit capabilities. Overloaded power sources and extension cords present fire and shock hazards. ● Elevated ambient temperature-If installed in a closed rack assembly, the operating temperature of the rack environment may be greater than the room ambient temperature. Use care not to exceed the 45°C (113°F) maximum ambient temperature of the switch. ● Reduced air flow-Install the equipment in the rack so that the amount of airflow required for safe operation of the equipment is not compromised. ● Reliable earthing-Maintain reliable earthing of rack-mounted equipment. Pay particular attention to the supply connections other than the direct connections to the branch circuit, for example, use of power strips. ● Do not mount the equipment with the back panel facing downward. One-half U front-rack installation Install the S5212F-ON switch using the following installation instructions. NOTE: To install the S5232F-ON, S5248F-ON, and S5224F-ON switches, see One U ReadyRails installation. To install the S5296F-ON switch, see Two U four-post rack assembly. The dual-tray mounting rails ship with the dual tray, not with the switch. You must supply eight rackmount screws for this installation. To install the one-half U switch: ● Attach the rails to the dual tray. ● Install the dual tray in the four-post rack. ● (Recommended) Attach the ground cable to the switch. ● Install the switch in the dual tray. NOTE: Do not install the dual tray in a two-post rack. 1. Remove the dual tray and the rails from the shipping packaging and place them on a clean antistatic surface. 2. Line up the three holes on the inner switch rail with the dual-tray mounting heads. 3. Attach the rail to the dual tray. Slide the rail back until it locks into place. 4. Repeat with the other side. S5200F-ON Series switch installation 29
![](/manual_guide/products/dell-s5212fon-emc-powerswitch-s5200fon-series-installation-guide-2022-7069ac6/29.png)