Dell S5224F-ON EMC PowerSwitch S5200F-ON Series Installation Guide February 20 - Page 29

One-half U front-rack installation, Rack mount safety considerations

Page 29 highlights

NOTE: The illustrations in this document are not intended to represent a specific switch. NOTE: Do not the use the mounted ReadyRails as a shelf or a workplace. Rack mount safety considerations ● Rack loading-Overloading or uneven loading of racks may result in shelf or rack failure, possibly damaging the equipment and causing personal injury. Stabilize racks in a permanent location before loading begins. Mount the components starting at the bottom of the rack, then work to the top. Do not exceed your rack's load rating. ● Power considerations-Connect only to the power source specified on the unit. When you install multiple electrical components in a rack, ensure that the total component power ratings do not exceed the circuit capabilities. Overloaded power sources and extension cords present fire and shock hazards. ● Elevated ambient temperature-If installed in a closed rack assembly, the operating temperature of the rack environment may be greater than the room ambient temperature. Use care not to exceed the 45°C (113°F) maximum ambient temperature of the switch. ● Reduced air flow-Install the equipment in the rack so that the amount of airflow required for safe operation of the equipment is not compromised. ● Reliable earthing-Maintain reliable earthing of rack-mounted equipment. Pay particular attention to the supply connections other than the direct connections to the branch circuit, for example, use of power strips. ● Do not mount the equipment with the back panel facing downward. One-half U front-rack installation Install the S5212F-ON switch using the following installation instructions. NOTE: To install the S5232F-ON, S5248F-ON, and S5224F-ON switches, see One U ReadyRails installation. To install the S5296F-ON switch, see Two U four-post rack assembly. The dual-tray mounting rails ship with the dual tray, not with the switch. You must supply eight rackmount screws for this installation. To install the one-half U switch: ● Attach the rails to the dual tray. ● Install the dual tray in the four-post rack. ● (Recommended) Attach the ground cable to the switch. ● Install the switch in the dual tray. NOTE: Do not install the dual tray in a two-post rack. 1. Remove the dual tray and the rails from the shipping packaging and place them on a clean antistatic surface. 2. Line up the three holes on the inner switch rail with the dual-tray mounting heads. 3. Attach the rail to the dual tray. Slide the rail back until it locks into place. 4. Repeat with the other side. S5200F-ON Series switch installation 29

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64

NOTE:
The illustrations in this document are not intended to represent a specific switch.
NOTE:
Do not the use the mounted ReadyRails as a shelf or a workplace.
Rack mount safety considerations
Rack loading—Overloading or uneven loading of racks may result in shelf or rack failure, possibly damaging the equipment
and causing personal injury. Stabilize racks in a permanent location before loading begins. Mount the components starting at
the bottom of the rack, then work to the top. Do not exceed your rack’s load rating.
Power considerations—Connect only to the power source specified on the unit. When you install multiple electrical
components in a rack, ensure that the total component power ratings do not exceed the circuit capabilities. Overloaded
power sources and extension cords present fire and shock hazards.
Elevated ambient temperature—If installed in a closed rack assembly, the operating temperature of the rack environment
may be greater than the room ambient temperature. Use care not to exceed the 45°C (113°F) maximum ambient
temperature of the switch.
Reduced air flow—Install the equipment in the rack so that the amount of airflow required for safe operation of the
equipment is not compromised.
Reliable earthing—Maintain reliable earthing of rack-mounted equipment. Pay particular attention to the supply connections
other than the direct connections to the branch circuit, for example, use of power strips.
Do not mount the equipment with the back panel facing downward.
One-half U front-rack installation
Install the S5212F-ON switch using the following installation instructions.
NOTE:
To install the S5232F-ON, S5248F-ON, and S5224F-ON switches, see
One U ReadyRails installation
. To install the
S5296F-ON switch, see
Two U four-post rack assembly
.
The dual-tray mounting rails ship with the dual tray, not with the switch. You must supply eight rackmount screws for this
installation.
To install the one-half U switch:
Attach the rails to the dual tray.
Install the dual tray in the four-post rack.
(Recommended) Attach the ground cable to the switch.
Install the switch in the dual tray.
NOTE:
Do not install the dual tray in a two-post rack.
1.
Remove the dual tray and the rails from the shipping packaging and place them on a clean antistatic surface.
2.
Line up the three holes on the inner switch rail with the dual-tray mounting heads.
3.
Attach the rail to the dual tray. Slide the rail back until it locks into place.
4.
Repeat with the other side.
S5200F-ON Series switch installation
29