Dell S5224F-ON EMC PowerSwitch S5200F-ON Series Installation Guide February 20 - Page 40

PSU status LED, DC wire RTN

Page 40 highlights

1. DC wire RTN 3. Captive screws (2) 5. PSU status LED 7. DC wire -48V The DC power connector ground: 2. DC power connector 4. Orange tab 6. DC power socket 1. Ground nut 3. Lock washer 5. Device grounding rod 2. Washer 4. Ground cable To connect a DC PSU to the site's DC power source: 1. Strip 1/2 inches of insulation from each of the power connector's wires, as shown. 2. Insert each of the power connector's bare wire lengths into the wiring block, as shown. 3. Use a flat-blade screwdriver to tighten the screws that secures the bare wires into the wiring block. 4. Secure the site's DC power source wires to the other side of the wiring block (See steps 1 and 3). 5. Insert the DC power connector into the power socket of the DC PSU. Ensure that the connector pins firmly seat and you hear the click of the power connector's left and right levered clamps lock into place. 40 S5200F-ON Series switch installation

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64

1.
DC wire RTN
2.
DC power connector
3.
Captive screws (2)
4.
Orange tab
5.
PSU status LED
6.
DC power socket
7.
DC wire -48V
The DC power connector ground:
1.
Ground nut
2.
Washer
3.
Lock washer
4.
Ground cable
5.
Device grounding rod
To connect a DC PSU to the site’s DC power source:
1.
Strip 1/2 inches of insulation from each of the power connector’s wires, as shown.
2.
Insert each of the power connector’s bare wire lengths into the wiring block, as shown.
3.
Use a flat-blade screwdriver to tighten the screws that secures the bare wires into the wiring block.
4.
Secure the site’s DC power source wires to the other side of the wiring block (See steps 1 and 3).
5.
Insert the DC power connector into the power socket of the DC PSU. Ensure that the connector pins firmly seat and you
hear the click of the power connector’s left and right levered clamps lock into place.
40
S5200F-ON Series switch installation