Dell S5224F-ON EMC PowerSwitch S5200F-ON Series Installation Guide February 20 - Page 34
Two-post center-mount installation
![]() |
View all Dell S5224F-ON manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 34 highlights
2. Attach one rail to the front post flange with two user-supplied screws, item 2. 3. Slide the plunger bracket forward against the vertical post and secure the plunger bracket to the post flange with two user-supplied screws, item 3. 4. Repeat this procedure for the second rail. Two-post center-mount installation NOTE: For more installation instructions, see the installation labels attached to the rail assembly. 1. Slide the plunger bracket rearward until it clicks into place and secure the bracket to the front post flange with two user-supplied screws, item 1. 34 S5200F-ON Series switch installation
![](/manual_guide/products/dell-s5212fon-emc-powerswitch-s5200fon-series-installation-guide-2022-7069ac6/34.png)
2.
Attach one rail to the front post flange with two user-supplied screws, item 2.
3.
Slide the plunger bracket forward against the vertical post and secure the plunger bracket to the post flange with two
user-supplied screws, item 3.
4.
Repeat this procedure for the second rail.
Two-post center-mount installation
NOTE:
For more installation instructions, see the installation labels attached to the rail assembly.
1.
Slide the plunger bracket rearward until it clicks into place and secure the bracket to the front post flange with two
user-supplied screws, item 1.
34
S5200F-ON Series switch installation