Dell S5224F-ON EMC PowerSwitch S5200F-ON Series Installation Guide February 20 - Page 32

U Tool-less mount installation

Page 32 highlights

NOTE: Do not use the ReadyRails system for the S5212F-ON and S5296F-ON switches. For the S5212F-ON switch installation instructions, see One-half U front-rack installation. For the S5296F-ON switch installation instructions, see Two U four-post rack assembly. To begin installation, separate each rail assembly by sliding the inside rail out of the outside rail. NOTE: For more installation instructions, see the installation labels attached to the rail assembly. 1U Tool-less mount installation NOTE: For more installation instructions, see the installation labels attached to the rail assembly. 1. Face the ReadyRails flange ears facing outward. Place one rail between the left and right vertical posts. Align and seat the back flange rail pegs in the back vertical post flange. The center extractions show how the pegs appear in both the square and nonthreaded round holes. 32 S5200F-ON Series switch installation

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64

NOTE:
Do not use the ReadyRails system for the S5212F-ON and S5296F-ON switches. For the S5212F-ON switch
installation instructions, see
One-half U front-rack installation
. For the S5296F-ON switch installation instructions, see
Two
U four-post rack assembly
.
To begin installation, separate each rail assembly by sliding the inside rail out of the outside rail.
NOTE:
For more installation instructions, see the installation labels attached to the rail assembly.
1U Tool-less mount installation
NOTE:
For more installation instructions, see the installation labels attached to the rail assembly.
1.
Face the ReadyRails flange ears facing outward. Place one rail between the left and right vertical posts. Align and seat the
back flange rail pegs in the back vertical post flange.
The center extractions show how the pegs appear in both the square and nonthreaded round holes.
32
S5200F-ON Series switch installation