Dell S5296F-ON EMC PowerSwitch S5200F-ON Series Setup Guide - Page 10

One-half U front-rack installation

Page 10 highlights

• Reduced airflow-Do not compromise the amount of airflow needed for safe operation of the equipment. Install the equipment in the rack so that the equipment constantly has the correct amount of airflow surrounding it. • Reliable earthing-Maintain reliable earthing of rack-mounted equipment. Pay particular attention to the supply connections other than the direct connections to the branch circuit, for example: use of power strips. • Do not mount the equipment with the fan panel facing in the downward position. One-half U front-rack installation Install the S5212F-ON switch using the following installation instructions. NOTE: To install the S5232F-ON, S5248F-ON, or S5224F-ON switch, see One U ReadyRails installation. To install the S5296F-ON switch, see Two U four-post rack assembly. The dual-tray mounting rails ship with the dual tray, not with the switch. You must supply eight rackmount screws for this installation. To install the one-half U switch: • Attach the rails to the dual tray. • Install the dual tray in the four-post rack. • (Recommended) Attach the ground cable to the switch. • Install the switch in the dual tray. NOTE: Do not install the dual tray in a two-post rack. 1. Remove the dual tray and the rails from the shipping packaging and place them on a clean antistatic surface. 2. Line up the three holes on the inner switch rail with the dual-tray mounting heads. Figure 2. Dual-tray and rack mounting rail 3. Attach the rail to the dual tray. Slide the rail back until it locks into place. 4. Repeat with the other side. Figure 3. Attach dual-tray and rack mounting rails 5. Install the dual tray inside the four-post rack. Rackmount screws are not included. 6. Attach the front dual-tray switch rails to the four-post rack from the front. Secure the dual tray to the rack using two user-supplied screws for each rack post. 10 S5200F-ON Series switch Installation

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26

Reduced airflow—Do not compromise the amount of airflow needed for safe operation of the equipment. Install the equipment in the
rack so that the equipment constantly has the correct amount of airflow surrounding it.
Reliable earthing—Maintain reliable earthing of rack-mounted equipment. Pay particular attention to the supply connections other
than the direct connections to the branch circuit, for example: use of power strips.
Do not mount the equipment with the fan panel facing in the downward position.
One-half U front-rack installation
Install the S5212F-ON switch using the following installation instructions.
NOTE:
To install the S5232F-ON, S5248F-ON, or S5224F-ON switch, see
One U ReadyRails installation
. To install the
S5296F-ON switch, see
Two U four-post rack assembly
.
The dual-tray mounting rails ship with the dual tray, not with the switch. You must supply eight rackmount screws for this installation.
To install the one-half U switch:
Attach the rails to the dual tray.
Install the dual tray in the four-post rack.
(Recommended) Attach the ground cable to the switch.
Install the switch in the dual tray.
NOTE:
Do not install the dual tray in a two-post rack.
1.
Remove the dual tray and the rails from the shipping packaging and place them on a clean antistatic surface.
2.
Line up the three holes on the inner switch rail with the dual-tray mounting heads.
Figure 2. Dual-tray and rack mounting rail
3.
Attach the rail to the dual tray. Slide the rail back until it locks into place.
4.
Repeat with the other side.
Figure 3. Attach dual-tray and rack mounting rails
5.
Install the dual tray inside the four-post rack. Rackmount screws are not included.
6.
Attach the front dual-tray switch rails to the four-post rack from the front. Secure the dual tray to the rack using two user-supplied
screws for each rack post.
10
S5200F-ON Series switch Installation