Dell S5296F-ON EMC PowerSwitch S5200F-ON Series Setup Guide - Page 16

S5200F-ON Series switch installation, 1U front-rack installation

Page 16 highlights

Figure 15. Four-post threaded installation 2. For each rail, attach the front and back flanges to the post flanges with two user-supplied screws at each end. S5200F-ON Series switch installation For the 1U two-post configurations for the S5248F-ON, S5232F-ON, and S5224F-ON switches, slide the switch into the rails in the same manner as the four-post configurations. For the S5296F-ON switch installation, see S5296F-ON four-post rack assembly. For the S5212F-ON switch installation, see One-half U switch installation. 1U front-rack installation Configure the rails that are attached to the switch. 1. NOTE: For more information, see the installation instruction labels on the rail. Attach the inner switch rails to the S5200F-ON Series switch. Line up the rail with the mounting heads and attach the rail to the chassis. Slide the rail back until it locks into place. The following shows the detail of the front standoff with the locking tab: 16 S5200F-ON Series switch Installation

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26

Figure 15. Four-post threaded installation
2.
For each rail, attach the front and back flanges to the post flanges with two user-supplied screws at each end.
S5200F-ON Series switch installation
For the 1U two-post configurations for the S5248F-ON, S5232F-ON, and S5224F-ON switches, slide the switch into the rails in the same
manner as the four-post configurations.
For the S5296F-ON switch installation, see
S5296F-ON four-post rack assembly
. For the S5212F-ON switch installation, see
One-half U
switch installation
.
1U front-rack installation
Configure the rails that are attached to the switch.
1.
NOTE:
For more information, see the installation instruction labels on the rail.
Attach the inner switch rails to the S5200F-ON Series switch.
Line up the rail with the mounting heads and attach the rail to the chassis. Slide the rail back until it locks into place. The following
shows the detail of the front standoff with the locking tab:
16
S5200F-ON Series switch Installation