Dell S5296F-ON EMC PowerSwitch S5200F-ON Series Setup Guide - Page 12

One-half U switch removal, One U ReadyRails installation

Page 12 highlights

Figure 8. Dual-tray stop feature 2. Insert the second switch in the open dual-tray slot if you are installing two switches. One-half U switch removal Remove the S5212F-ON switch from the dual tray from the front of the four-post rack. NOTE: To remove the S5232F-ON, S5248F-ON, or S5224F-ON switch, see One U ReadyRails installation. To remove the S5296F-ON switch, see Two U four-post rack assembly. Push in the front switch latches according to the latch arrows and pull out the switch. Figure 9. Switch release latches Figure 10. Switch release arrow One U ReadyRails installation For the S5248F-ON, S5232F-ON, and S5224F-ON switches, you can install the ReadyRails system using the 1U tool-less square-hole method or one of three possible 1U threaded round-hole methods. The tooled installation methods include two-post flush mount, two-post center mount, or four-post threaded mount. NOTE: To install the S5212F-ON switch, see One-half U front-rack installation. To install the S5296F-ON switch, see Two U four-post rack assembly. To begin installation, separate each rail assembly by sliding the inside rail out of the outside rail. 12 S5200F-ON Series switch Installation

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26

Figure 8. Dual-tray stop feature
2.
Insert the second switch in the open dual-tray slot if you are installing two switches.
One-half U switch removal
Remove the S5212F-ON switch from the dual tray from the front of the four-post rack.
NOTE:
To remove the S5232F-ON, S5248F-ON, or S5224F-ON switch, see
One U ReadyRails installation
. To remove the
S5296F-ON switch, see
Two U four-post rack assembly
.
Push in the front switch latches according to the latch arrows and pull out the switch.
Figure 9. Switch release latches
Figure 10. Switch release arrow
One U ReadyRails installation
For the S5248F-ON, S5232F-ON, and S5224F-ON switches, you can install the ReadyRails system using the 1U tool-less square-hole
method or one of three possible 1U threaded round-hole methods. The tooled installation methods include two-post flush mount, two-post
center mount, or four-post threaded mount.
NOTE:
To install the S5212F-ON switch, see
One-half U front-rack installation
. To install the S5296F-ON switch, see
Two U four-post rack assembly
.
To begin installation, separate each rail assembly by sliding the inside rail out of the outside rail.
12
S5200F-ON Series switch Installation