Dell S5296F-ON EMC PowerSwitch S5200F-ON Series Setup Guide - Page 12
One-half U switch removal, One U ReadyRails installation
View all Dell S5296F-ON manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 12 highlights
Figure 8. Dual-tray stop feature 2. Insert the second switch in the open dual-tray slot if you are installing two switches. One-half U switch removal Remove the S5212F-ON switch from the dual tray from the front of the four-post rack. NOTE: To remove the S5232F-ON, S5248F-ON, or S5224F-ON switch, see One U ReadyRails installation. To remove the S5296F-ON switch, see Two U four-post rack assembly. Push in the front switch latches according to the latch arrows and pull out the switch. Figure 9. Switch release latches Figure 10. Switch release arrow One U ReadyRails installation For the S5248F-ON, S5232F-ON, and S5224F-ON switches, you can install the ReadyRails system using the 1U tool-less square-hole method or one of three possible 1U threaded round-hole methods. The tooled installation methods include two-post flush mount, two-post center mount, or four-post threaded mount. NOTE: To install the S5212F-ON switch, see One-half U front-rack installation. To install the S5296F-ON switch, see Two U four-post rack assembly. To begin installation, separate each rail assembly by sliding the inside rail out of the outside rail. 12 S5200F-ON Series switch Installation