HP Cisco MDS 8/24c Cisco MDS 8Gb Fabric Switch for HP BladeSystem c-Class User - Page 11
Installation, Shipping carton contents, Installation and safety considerations
View all HP Cisco MDS 8/24c manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 11 highlights
2 Installation Shipping carton contents The Cisco MDS 8Gb Fabric Switch for HP BladeSystem c-Class kit shipping carton (Figure 3) contains: • One Cisco MDS 8Gb Fabric Switch with two or four SFPs installed. Models include: • One Cisco MDS 8Gb 12-Port Fabric Switch with eight internal and four external active ports and two 8Gb short range SFPs installed • One Cisco MDS 8Gb 24-Port Fabric Switch with sixteen internal and eight external active ports and four 8Gb short range SFPs installed • One bag containing black, plastic SFP dust covers to insert in ports where SFP optical transceivers are not installed • Cisco MDS 8Gb Fabric Switch for HP BladeSystem c-Class Installation Instructions 1 2 3 199543 scale: 3/8" = 1" 20 19 18 17 EXT 5 EXT 6 EXT 7 EXT 8 CCiscIoSMDCSO9124e ! Figure 3 Carton contents 1 Cisco MDS 8Gb Fabric Switch 2 Dust covers for empty SFP ports 3 Cisco MDS 8Gb Fabric Switch for HP BladeSystem c-Class Installation Instructions Installation and safety considerations The Cisco MDS 8Gb Fabric Switch is installed in the I/O bays in the rear of the HP BladeSystem c-Class enclosure. For specific enclosure requirements, see the HP BladeSystem c7000 Enclosure Setup and Installation Guide on the HP website: http://bizsupport2.austin.hp.com/bc/docs/support/SupportManual/c00698286/c00698286.pdf Installing multiple switches When installing multiple switches, install and configure one Cisco MDS 8Gb Fabric Switch at a time. Each switch must be assigned a unique Ethernet IP address during configuration. Once the IP address on the Cisco MDS 8Gb Fabric Switch is set, install additional switches in the enclosure. See the HP BladeSystem c7000 Enclosure Setup and Installation Guide for help identifying your specific enclosure setup, available connections, and power requirements. Electrical considerations The Cisco MDS 8Gb Fabric Switch requires 55 watts. There are no other power requirements or provisions. Environmental considerations Ensure proper cooling and ventilation by verifying the following: • The air vents on the enclosure are not blocked or restricted. • The ambient air temperature at the front of the enclosure does not exceed 35°C (95°F) while the switch is operating. Cisco MDS 8Gb Fabric Switch for HP BladeSystem c-Class User Guide 11