Server management Pre- and post-installation procedures Pre-installation procedures WARNING: Failure to properly turn off the server before you open the server or before you start removing or installing hardware components may cause serious damage as well as bodily harm. WARNING: To reduce the risk of personal injury from hot surfaces, allow the chassis and any installed hardware components to cool before touching them. CAUTION: Follow the ESD precautions listed in Chapter 2 of the HP ProLiant DL165 Generation 5 Server Maintenance and Service Guide when handling any hardware component. 1. Turn off the server and all the peripherals connected to it. 2. Disconnect the AC power cord from the power supply cable located on the server rear panel to turn off the service processor and reduce the risk of electrical shock. 3. Remove the top cover from the chassis. 4. Place the top cover in a safe place for reinstallation later. Post-installation procedures 1. Be sure all components are installed according to the described step-by-step instructions. 2. Check to make sure you have not left loose tools or parts inside the server. 3. Reinstall any expansion boards, riser board assemblies, peripherals, board covers, brackets, and system cables that you have removed. 4. Reinstall the top cover: a. Place the cover on the chassis approximately 1.25 cm (0.5 in) toward the rear of the unit, then slide the cover forward into place. b. Tighten the captive screw on the rear panel. 5. Connect all external cables and the AC power cord to the system. 6. Route the cables properly through the available cable management arrangement. 7. Press the power button on the front panel to turn on the server. Server management 58

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62

Server management 58
Server management
Pre- and post-installation procedures
Pre-installation procedures
WARNING:
Failure to properly turn off the server before you open the server or before you start
removing or installing hardware components may cause serious damage as well as bodily harm.
WARNING:
To reduce the risk of personal injury from hot surfaces, allow the chassis and any
installed hardware
components to cool before touching them.
CAUTION:
Follow the ESD precautions listed in Chapter 2 of the
HP ProLiant DL165 Generation 5
Server Maintenance and Service Guide
when handling any hardware component.
1.
Turn off the server and all the peripherals connected to it.
2.
Disconnect the AC power cord from the power supply cable located on the server rear panel to
turn off the service processor and reduce the risk of electrical shock.
3.
Remove the top cover from the chassis.
4.
Place the top cover in a safe place for reinstallation later.
Post-installation procedures
1.
Be sure all components are installed according to the described step-by-step instructions.
2.
Check to make sure you have not left loose tools or parts inside the server.
3.
Reinstall any expansion boards, riser board assemblies, peripherals, board covers, brackets,
and system cables that you have removed.
4.
Reinstall the top cover:
a.
Place the cover on the chassis approximately 1.25 cm (0.5 in) toward the rear of the unit,
then slide the cover forward into place.
b.
Tighten the captive screw on the rear panel.
5.
Connect all external cables and the AC power cord to the system.
6.
Route the cables properly through the available cable management arrangement.
7.
Press the power button on the front panel to turn on the server.