HP NetServer LXr Pro8 HP Netserver Mass Storage Upgrade Guide - Page 14

Insulating Sheet, Filler Panel 5 places

Page 14 highlights

Chapter 2 Installation 1. Orient the hot-swap mass storage cage, as shown in Figure 2-2. The backplane of the cage faces into the empty expansion bay. The connectors on the cage's backplane are near the edge closest to the CD-ROM drive. CAUTION As you insert the cage, be careful not to damage the insulating sheet covering the cage's backplane and part of one side. Insulating Sheet Insulating Sheet Filler Panel (5 places) Filler Panel (5 places) Figure 2-2. Orient and Insert the Hot-Swap Mass Storage Cage 2. Insert the hot-swap mass storage cage by sliding it carefully into the mass storage expansion bay, as shown in Figure 2-2. NOTE If you are installing a secondary mass storage cage that has a duplex board installed, connect the appropriate SCSI cables now, before the cage is fully installed. This gives you easier access to the SCSI connectors. Refer to the HP NetServer Duplex Kit Installation Guide for instructions. 3. When the cage is correctly positioned, press it firmly into place, so that its flanges are flush with the chassis front. 10

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48

Chapter 2
Installation
10
1.
Orient the hot-swap mass storage cage, as shown in Figure 2-2. The
backplane of the cage faces into the empty expansion bay. The connectors
on the cage’s backplane are near the edge closest to the CD-ROM drive.
CAUTION
As you insert the cage, be careful not to damage the insulating
sheet covering the cage’s backplane and part of one side.
Insulating Sheet
Insulating Sheet
Filler Panel (5 places)
Filler Panel (5 places)
Figure 2-2. Orient and Insert the Hot-Swap Mass Storage Cage
2.
Insert the hot-swap mass storage cage by sliding it carefully into the mass
storage expansion bay, as shown in Figure 2-2.
NOTE
If you are installing a secondary mass storage cage that has a
duplex board installed, connect the appropriate SCSI cables
now, before the cage is fully installed. This gives you easier
access to the SCSI connectors. Refer to the
HP NetServer
Duplex Kit Installation Guide
for instructions.
3.
When the cage is correctly positioned, press it firmly into place, so that its
flanges are flush with the chassis front.