HP NetServer LXr Pro8 HP Netserver Mass Storage Upgrade Guide - Page 28

Step 11, Reconnect Power Cords and Other, Cables

Page 28 highlights

Chapter 2 Installation Installing Hot-Swap Drives CAUTION Protect the drive from static electricity by leaving it in its antistatic bag until you are ready to install it. Before handling the drive, touch any unpainted metal surface to discharge static electricity. When you remove the drive from the anti-static bag, handle it only by the frame. Do not touch the electrical components. Place the drive on the anti-static bag whenever you set it down. If the secondary hot-swap mass storage cage is locked, unlock it with its key. Refer to the HP NetServer Ultra2 SCSI Hot-swap Hard Disk Drive and Tray User Guide, and install the disk drive modules into the secondary hot-swap mass storage cage. Install all required drive spacers and filler panels. • Remove filler panels from the secondary hot-swap mass storage cage at the positions where you plan to install disk drive modules. • Filler panels must occupy all empty disk drive locations in the hot-swap mass storage cage. • Drive spacers must be installed to fill all empty spaces between adjacent disk drive modules or filler panels in the hot-swap mass storage cage. • Insert disk drive modules in the order shown by the "Load" arrow in Figure 2-12 or 2-13. Insert them slowly and gently to prevent damage, as described in HP NetServer Ultra2 SCSI Hot-swap Hard Disk Drive and Tray User Guide. CAUTION Do NOT operate the HP NetServer with any missing drive spacers or filler panels. Otherwise, overheating can damage disk drive modules. Step 11: Reconnect Power Cords and Other Cables 1. Reconnect the AC power cords and any other external cables. 2. Attach the power cord retainer for each AC power cord, as shown in your HP NetServer installation guide. 24

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48

Chapter 2
Installation
24
Installing Hot-Swap Drives
CAUTION
Protect the drive from static electricity by leaving it in its anti-
static bag until you are ready to install it. Before handling the
drive, touch any unpainted metal surface to discharge static
electricity. When you remove the drive from the anti-static
bag, handle it only by the frame.
Do not touch
the electrical components. Place the drive on the
anti-static bag whenever you set it down.
If the secondary hot-swap mass storage cage is locked, unlock it with its key.
Refer to the
HP NetServer Ultra2 SCSI Hot-swap Hard Disk Drive and Tray User
Guide
, and install the disk drive modules into the secondary hot-swap mass
storage cage. Install all required drive spacers and filler panels.
Remove filler panels from the secondary hot-swap mass storage cage at the
positions where you plan to install disk drive modules.
Filler panels must occupy all empty disk drive locations in the hot-swap
mass storage cage.
Drive spacers must be installed to fill all empty spaces between adjacent
disk drive modules or filler panels in the hot-swap mass storage cage.
Insert disk drive modules in the order shown by the "Load" arrow in
Figure 2-12 or 2-13. Insert them slowly and gently to prevent damage, as
described in
HP NetServer Ultra2 SCSI Hot-swap Hard Disk Drive and
Tray User Guide
.
CAUTION
Do NOT operate the HP NetServer with any missing drive
spacers or filler panels. Otherwise, overheating can damage
disk drive modules.
Step 11:
Reconnect Power Cords and Other
Cables
1.
Reconnect the AC power cords and any other external cables.
2.
Attach the power cord retainer for each AC power cord, as shown in your
HP NetServer installation guide.