HP XP20000/XP24000 HP StorageWorks XP24000/XP20000 Disk Array Site Preparation - Page 11

XP24000/XP20000 Disk Array Site Preparation Guide, Reference, Checklist questions

Page 11 highlights

* Checklist questions Yes No Reference * Does the new floor plan include the clearance required for the floor's load rating? XP24000 and XP20000 floor clearance requirements, page 27 Is the computer room structurally complete * (walls, floor, air conditioning system, and so on)? Computer room requirements, page 23 * Is the floor adequate for the equipment load? XP24000 and XP20000 floor clearance requirements, page 27 Is antistatic flooring or mats installed? Floor covering requirements, page 26 Is there a dedicated analog telephone line for the optional modem-based remote support solution (if chosen)? Data communication requirements, page 37 Is the infrastructure available for the default Internet-based remote support solution? Data communication requirements, page 37 Is a telephone line available for HP representative use? Data communication requirements, page 37 Is a private LAN available? Data communication requirements, page 37 * Can the temperature be maintained between 16 and 32 degrees C? Temperature specifications, page 33 * Can temperature changes be held to less than 10 degrees C per hour? Temperature specifications, page 33 * Can the humidity level be maintained between 20% and 80%? Humidity specifications, page 34 Is the computer room protected against dust, * pollution, and metallic particulate contamina- tion? Controlling dust and pollution, page 36 Does the computer room support other environ* mental considerations (such as vibration and acoustics)? Vibration specifications, page 34 Acoustic requirements, page 35 * Are two AC outlets, on different lines, available for the equipment? Electrical requirements, page 39 * Does the input voltage correspond to the DKC and DKU equipment specifications? Line voltage, page 39 XP24000 AC line voltage requirements, page 45 * Does the input frequency correspond to equipment specifications? Is an appropriate uninterruptedly power supply (UPS) strategy in place? If lightning arresters are recommended, are they installed? Frequency, page 40 Uninterruptible Power Supply (UPS), page 42 Sources of electrical interference, page 43 XP24000/XP20000 Disk Array Site Preparation Guide 11

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78

Reference
No
Yes
Checklist questions
*
XP24000 and XP20000 floor clearance re-
quirements
, page 27
Does the new floor plan include the clearance
required for the floor's load rating?
*
Computer room requirements
, page 23
Is the computer room structurally complete
(walls, floor, air conditioning system, and so
on)?
*
XP24000 and XP20000 floor clearance re-
quirements
, page 27
Is the floor adequate for the equipment load?
*
Floor covering requirements
, page 26
Is antistatic flooring or mats installed?
Data communication requirements
, page 37
Is there a dedicated analog telephone line for
the optional modem-based remote support
solution (if chosen)?
Data communication requirements
, page 37
Is the infrastructure available for the default In-
ternet-based remote support solution?
Data communication requirements
, page 37
Is a telephone line available for HP representat-
ive use?
Data communication requirements
, page 37
Is a private LAN available?
Temperature specifications
, page 33
Can the temperature be maintained between
16 and 32 degrees C?
*
Temperature specifications
, page 33
Can temperature changes be held to less than
10 degrees C per hour?
*
Humidity specifications
, page 34
Can the humidity level be maintained between
20% and 80%?
*
Controlling dust and pollution
, page 36
Is the computer room protected against dust,
pollution, and metallic particulate contamina-
tion?
*
Vibration specifications
, page 34
Acoustic requirements
, page 35
Does the computer room support other environ-
mental considerations (such as vibration and
acoustics)?
*
Electrical requirements
, page 39
Are two AC outlets, on different lines, available
for the equipment?
*
Line voltage
, page 39
XP24000 AC line voltage
requirements
, page 45
Does the input voltage correspond to the DKC
and DKU equipment specifications?
*
Frequency
, page 40
Does the input frequency correspond to equip-
ment specifications?
*
Uninterruptible Power Supply (UPS)
, page 42
Is an appropriate uninterruptedly power supply
(UPS) strategy in place?
Sources of electrical interference
, page 43
If lightning arresters are recommended, are they
installed?
XP24000/XP20000 Disk Array Site Preparation Guide