HP rp7420 Installation Guide, Fifth Edition - HP 9000 rp7420 Server - Page 64

damage to equipment when AC power is applied to the cabinet.

Page 64 highlights

Cabling and Power Up Voltage Check (Additional Procedure) WARNING Do not set site AC circuit breakers serving the processor cabinets to ON before verifying that the cabinet has been wired into the site AC power supply correctly. Failure to do so might result in injury to personnel or damage to equipment when AC power is applied to the cabinet. Step 9. Set the site power circuit breaker to ON. Step 10. Set the server power to ON. Step 11. Check that the indicator light on each power supply is lit. 64 Chapter 4

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80

Chapter 4
Cabling and Power Up
Voltage Check (Additional Procedure)
64
WARNING
Do not set site AC circuit breakers serving the processor cabinets to
ON
before verifying that the cabinet has been wired into the site AC power
supply correctly. Failure to do so might result in injury to personnel or
damage to equipment when AC power is applied to the cabinet.
Step 9.
Set the site power circuit breaker to
ON
.
Step 10.
Set the server power to
ON
.
Step 11.
Check that the indicator light on each power supply is lit.