IBM 3580-L11 Setup Guide - Page 5

Contents, Step 8. Installing the SCSI Host Adapter Card if required - drivers

Page 5 highlights

Contents Figures v Tables vii Safety and Environmental Notices ix Danger Notice ix Caution Notice ix Attention Notice xi Performing the Safety Inspection Procedure xi End of Life (EOL) Plan xi Preface xiii Related Publications xiv Chapter 1. Introduction 1 Supported Servers and Operating Systems 2 Supported Device Drivers 2 Specifications 3 Chapter 2. Installing the 3580 Tape Drive 5 Step 1. Unpacking the Tape Drive 5 Step 2. Using the Inventory Checklist 5 Step 3. Inspecting the Power Cord and Outlet 7 Step 4. Setting the SCSI ID 7 Step 5. Positioning the Tape Drive 7 Step 6. Connecting Power 8 Step 7. Running the Fast Read/Write Test 8 Step 8. Installing the SCSI Host Adapter Card (if required 10 Step 9. Installing Device Drivers 11 Step 10. Connecting the SCSI Bus Cable 11 Step 11. Configuring the 3580 Tape Drive to the Host 13 Chapter 3. Operating the 3580 Tape Drive 15 Power Switch 15 Unload Button 16 Status Light 17 Message Display 18 Single-Character Display 18 Inserting a Tape Cartridge 19 Removing a Tape Cartridge 20 Performing Diagnostic and Maintenance Functions 20 Updating the Drive Firmware 21 Cleaning the Drive Head 21 Cleaning the 3580 Tape Drive 21 Chapter 4. Using the Media 23 Data Cartridge 24 Guidelines for Using Bar Code Labels 25 Cleaning Cartridge 25 Setting the Write-Protect Switch 26 Reattaching a Leader Pin 27 Handling the Cartridges 32 Environmental and Shipping Specifications for Tape Cartridges 33 © Copyright IBM Corp. 2000 iii

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117

Contents
Figures
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
v
Tables
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
vii
Safety and Environmental Notices
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
ix
Danger Notice
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
ix
Caution Notice
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
ix
Attention Notice
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
xi
Performing the Safety Inspection Procedure
.
.
.
.
.
.
.
.
.
.
.
.
.
.
xi
End of Life (EOL) Plan
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
xi
Preface
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
xiii
Related Publications
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
xiv
Chapter 1. Introduction
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
1
Supported Servers and Operating Systems
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
2
Supported Device Drivers
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
2
Specifications
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
3
Chapter 2. Installing the 3580 Tape Drive
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
5
Step 1. Unpacking the Tape Drive
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
5
Step 2. Using the Inventory Checklist
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
5
Step 3. Inspecting the Power Cord and Outlet
.
.
.
.
.
.
.
.
.
.
.
.
.
.
7
Step 4. Setting the SCSI ID
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
7
Step 5. Positioning the Tape Drive
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
7
Step 6. Connecting Power
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
8
Step 7. Running the Fast Read/Write Test
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
8
Step 8. Installing the SCSI Host Adapter Card (if required)
.
.
.
.
.
.
.
.
.
10
Step 9. Installing Device Drivers
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
11
Step 10. Connecting the SCSI Bus Cable
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
11
Step 11. Configuring the 3580 Tape Drive to the Host
.
.
.
.
.
.
.
.
.
.
.
13
Chapter 3. Operating the 3580 Tape Drive
.
.
.
.
.
.
.
.
.
.
.
.
.
.
15
Power Switch
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
15
Unload Button
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
16
Status Light
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
17
Message Display
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
18
Single-Character Display
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
18
Inserting a Tape Cartridge
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
19
Removing a Tape Cartridge
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
20
Performing Diagnostic and Maintenance Functions
.
.
.
.
.
.
.
.
.
.
.
.
20
Updating the Drive Firmware
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
21
Cleaning the Drive Head
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
21
Cleaning the 3580 Tape Drive
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
21
Chapter 4. Using the Media
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
23
Data Cartridge
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
24
Guidelines for Using Bar Code Labels
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
25
Cleaning Cartridge
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
25
Setting the Write-Protect Switch
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
26
Reattaching a Leader Pin
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
27
Handling the Cartridges
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
32
Environmental and Shipping Specifications for Tape Cartridges
.
.
.
.
.
.
.
33
© Copyright IBM Corp. 2000
iii