LiftMaster CSW24V CSW24V Manual - Page 14

Installation, Determine Location For Concrete Pad And Operator, Concrete Pad And Operator Attachment

Page 14 highlights

INSTALLATION DETERMINE LOCATION FOR CONCRETE PAD AND OPERATOR + CONCRETE PAD & OPERATOR ATTACHMENT DETERMINE LOCATION FOR CONCRETE PAD AND OPERATOR 1 The gate operator should be installed near the front roller of the gate or near the back of the gate (in the OPEN position). The space between the gate and the output sprocket must be a minimum of 4 inches. 2 Lay out the concrete pad. STANDARD INSTALLATION 4"(10 cm) 1 26" (66 cm) 2 24" (61 cm) REAR INSTALLATION 1 2 CONCRETE PAD AND OPERATOR ATTACHMENT Check the national and local building codes before installation. 1 Install the electrical conduit. 2 Pour a concrete pad (reinforced concrete is recommended). The concrete pad should be 6 inches above the ground and deeper than the frost line. 3 Attach the operator to the concrete pad with appropriate fasteners. NOTE: An alternative to a concrete pad is to post mount the operator (refer to accessories). 3 5-5/8" 1/2" 7" 2-1/4" 1-3/8" CONDUIT LOCATION (Gate) 1-1/4" 3-1/2" min. 1-2" 2-3/4" MOUNTING FOOTPRINT 11.9" 10.3" 2.85" 4 Concrete Anchors 1/2" x 3 1/2" 2 (Conduit) .63" 13" 23" 26" 10.4" 1 14.1" 4-1/2" 8" 15" (Pad) 24" 14.6" 12 24" (61 cm) 4" (10 cm) 26" (66 cm) 24" (61 cm) Post Mount 6" Above Ground Below the frost line. Check all national and local codes. 26" (66 cm)

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48

12
1
The gate operator should be installed near the front roller of the gate or near
the back of the gate (in the OPEN position). The space between the gate and
the output sprocket must be a minimum of 4 inches.
2
Lay out the concrete pad.
4"(10 cm)
24"
(61 cm)
CONCRETE PAD AND OPERATOR ATTACHMENT
Check the national and local building codes before installation.
1
Install the electrical conduit.
2
Pour a concrete pad (reinforced concrete is recommended). The concrete pad
should be 6 inches above the ground and deeper than the frost line.
3
Attach the operator to the concrete pad with appropriate fasteners.
NOTE:
An alternative to a concrete pad is to post mount the operator
(refer to accessories).
STANDARD INSTALLATION
REAR INSTALLATION
1
2
1
2
4" (10 cm)
26"
(66 cm)
24" (61 cm)
26"
(66 cm)
4 Concrete Anchors
1/2" x 3 1/2"
Below the frost line.
Check all national and
local codes.
6" Above Ground
1
3
2
26"
(66 cm)
24"
(61 cm)
14.6"
MOUNTING FOOTPRINT
11.9"
.63"
CONDUIT LOCATION
Post Mount
10.3"
2.85"
10.4"
14.1"
26"
24"
15"
DETERMINE LOCATION FOR CONCRETE PAD AND OPERATOR +
CONCRETE PAD & OPERATOR ATTACHMENT
INSTALLATION
DETERMINE LOCATION FOR CONCRETE PAD AND OPERATOR
23"
8"
13"
1-3/8"
1-2"
2-3/4"
3-1/2" min.
5-5/8"
1/2"
4-1/2"
7"
1-1/4"
(Gate)
2-1/4"
(Conduit)
(Pad)