LiftMaster CSW24V CSW24V Manual - Page 21
Bipart Delay/synchronized Close, Connect Batteries, Bipart Delay, Synchronized Close - swing gate opener
View all LiftMaster CSW24V manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 21 highlights
WIRING DUAL GATES ONLY BIPART DELAY/SYNCHRONIZED CLOSE The LOCK/BIPART DELAY switch is used only with dual gate applications and serves two functions: • BIPART DELAY SWING GATE APPLICATIONS: The BIPART DELAY is used in applications where a mag-lock, solenoid lock, or decorative overlay would require one gate to close before the other. The operator with the LOCK/BIPART DELAY switch ON will delay from the close limit when opening and be the first to close from the open limit. SLIDE GATE APPLICATIONS: Not applicable, set to OFF. • SYNCHRONIZED CLOSE The BIPART DELAY is also used in applications where one gate travels a longer distance than the other. To synchronize the closing of the gates, set the LOCK/BIPART DELAY switch to ON for both operators. DUAL GATES ONLY + CONNECT BATTERIES RESET ALARM CONNECT BATTERIES 7AH BATTERIES The batteries are charged in the circuit by the integrated transformer. The batteries are for battery backup or solar installation. 1 Turn OFF AC power to the operator. 2 Unplug the J15 plug labeled BATT on the control board by squeezing the plug and pulling it from the control board. 3 Connect a jumper between the positive (+) terminal of one battery to the negative terminal (-) of the other battery. 4 Connect the red wire from the J15 plug to the positive (+) terminal of the battery. 5 Connect the black wire from the J15 plug to the negative (-) terminal of the battery. 6 Plug the J15 plug back into the control board. This will power up the control board. 7 Turn ON AC power to the operator. 8 Turn ON the AC power switch on the operator. (with heater) J15 Plug 19 Red Wire Jumper Black Wire +- + - (without heater)