Netgear WBC502 Hardware Installation Guide - Page 34
Step 2: Prepare the site
View all Netgear WBC502 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 34 highlights
Insight Instant AirBridge WBC502 Hardware Installation Guide Step 2: Prepare the site Before you install the AirBridge, make sure that the installation site or sites meet the requirements. Table 2. Site requirements Characteristics Mounting Power source Cabling Environmental Requirements Wall installations. Use the wall mounting screws, anchors, and paper screw placement guide that are provided in the package to mount the AirBridge onto a flat wall. Pole installations. Use the pole mounting strap that is provided in the package to mount the AirBridge onto a pole with a diameter of up to 4 inches. Use only the power adapter and power cord that are supplied with the AirBridge. Make sure that the AC outlet is not controlled by a wall switch, which can accidentally turn off power to the outlet and the AirBridge. You must provide an Ethernet cable of up to 328 ft (100 m) to connect the power adapter from an inside location to the AirBridge, which you can install either at an inside or outside location. Route cables to avoid sources of electrical noise such as radio transmitters, broadcast amplifiers, power lines, and fluorescent lighting fixtures. Temperature AirBridge. Install the AirBridge at a site where the ambient temperature is between -4ºF and 140ºF (-20ºC and 60ºC). Keep the AirBridge away from heat sources such as direct sunlight, warm-air exhausts, and hot-air vents. Temperature power adapter. The power adapter must be installed inside, not outside. For the power adapter, the ambient temperature must be between 32ºF and 104ºF (0ºC and 40ºC). Operating humidity AirBridge and power adapter. The maximum relative humidity of the installation locations must not exceed 90 percent, noncondensing. Installation 34 Hardware Installation Guide