Weider 4990 I Uk Manual - Page 15

M10 x 50mm Bolt 58, two M10 Washers 73

Page 15 highlights

21. Route the High Cable (53) through the center 21 bracket on the Top Frame (8). Attach a Pulley (42) and two Cable Guides (52) to the center bracket on the Top Frame (8) with an M10 x 52mm Bolt (67), two M10 Washers (73), and an M10 Locknut (68). Make sure that the Cable Guides (52) are holding the High Cable (53) in the groove of the Pulley (42). 68 73 8 52 42 53 73 67 52 22. Route the High Cable (53) through the rear 22 bracket on the Top Frame (8). Attach a Pulley (42) and two Cable Guides (52) to the rear bracket on the Top Frame (8) with an M10 x 50mm Bolt (58), two M10 Washers (73), and an M10 Locknut (68). Make sure that the Cable Guides (52) are holding the High Cable (53) in the groove of the Pulley (42). Then, pull the High Cable (53) downward between the center and rear brackets on the Top Frame (8) so that there is slack in the High Cable. The slack will be used in step 24. 23. Thread a 1/2" Nut (84) all of the way onto the High Cable (53). 23 Place a 26mm Washer (77) and a 13mm Washer (78) on top of the Weight Selector (7). Tighten the High Cable (53) three quarters of the way into the Weight Selector (7). Then, tighten the 1/2" Nut (84) against the 13mm Washer (78). 68 73 8 73 52 42 52 58 53 53 84 78 77 7 15

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32

15
21. Route the High Cable (53) through the center
bracket on the Top Frame (8).
Attach a Pulley (42) and two Cable Guides (52)
to the center bracket on the Top Frame (8) with
an M10 x 52mm Bolt (67), two M10 Washers
(73), and an M10 Locknut (68).
Make sure that the Cable Guides (52) are
holding the High Cable (53) in the groove of
the Pulley (42).
21
22. Route the High Cable (53) through the rear
bracket on the Top Frame (8).
Attach a Pulley (42) and two Cable Guides (52)
to the rear bracket on the Top Frame (8) with an
M10 x 50mm Bolt (58), two M10 Washers (73),
and an M10 Locknut (68).
Make sure that the Cable Guides (52) are
holding the High Cable (53) in the groove of
the Pulley (42).
Then, pull the High Cable (53) downward
between the center and rear brackets on the
Top Frame (8) so that there is slack in the High
Cable.
The slack will be used in step 24.
22
23. Thread a 1/2" Nut (84) all of the way onto the
High Cable (53).
Place a 26mm Washer (77) and a 13mm
Washer (78) on top of the Weight Selector (7).
Tighten the High Cable (53) three quarters of
the way into the Weight Selector (7). Then,
tighten the 1/2" Nut (84) against the 13mm
Washer (78).
23
68
73
73
53
67
42
8
68
73
73
58
8
53
53
84
78
77
7
52
52
52
42
52