ZyXEL U-336E User Manual - Page 19
Installation
![]() |
View all ZyXEL U-336E manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 19 highlights
2 Installation This chapter describes the panel function and installation procedure for the U-336E. A shielded RS-232 cable is required to ensure compliance with FCC Part 15, and it is the responsibility of the user to provide and use a shielded RS-232 cable. Make sure your installation site is clean and well ventilated. The ventilation slot of your ZyXEL modem located on the sides and bottom should not be covered and should allow free movement of air. Front Panel Figure 2-1 shows the front panel of the U-336E. There are 10 LED indicators, a 20 x 2 LCD display, and four key switches. Figure 2-1 Front Panel Front Panel LEDs V34 V.34 mode indicator, lights up when your modem is operating in V.34 mode; flashes when your modem is in Handshaking State. Installation 7
![](/manual_guide/products/zyxel-u336e-user-manual-04f1f9b/19.png)