Compaq ProLiant 6500 Compaq Parallel Database Cluster Model PDC/O2000 for Orac - Page 190
Upgrading Oracle8i Server, Upgrading the OSDs, Stop the Oracle services OracleCMService
View all Compaq ProLiant 6500 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 190 highlights
Cluster Management 6-11 Upgrading Oracle8i Server The design of the PDC/O2000 is tightly integrated with Oracle8i Server. Significant changes in Oracle8i Server will likely affect the operation of the cluster. Before upgrading to any new release of Oracle8i Server, consult your Compaq and Oracle service representatives. Make sure that the new release is certified and supported on the PDC/O2000, and get assistance to determine which procedure you should follow to perform the upgrade properly. Upgrading the OSDs During the life of your PDC/O2000, you will need to upgrade the operating system dependent modules as new versions are released. Before beginning the upgrade procedure: 1. Make sure that the person performing the upgrade has administrative privilege on each cluster node. 2. Make sure that all cluster nodes are active. From each node, run the ping utility to verify that every node recognizes the other nodes by host name. 3. Shut down the Oracle database on all nodes. 4. Stop the Oracle services (OracleCMService, OracleNMService, and OracleServiceSID) on all nodes. Once you have completed these steps, you can deinstall the existing OSDs and install the new versions as described in the following procedure.