Compaq ProLiant 6500 Compaq Parallel Database Cluster Model PDC/O2000 for Orac - Page 199

Installing the Object Link Manager, Parallel Server Option on

Page 199 highlights

6-20 Compaq Parallel Database Cluster Model PDC/O2000 for Oracle8i and Windows 2000 Administrator Guide 1. To add a node to the cluster, you must disassemble the existing cluster and then reform it to include the replacement node. Do the following on all original cluster nodes (not the replacement node): a. Shut down the Oracle instance. b. Stop all Oracle services. c. Deinstall the OSDs using the OUI from the original installing node. d. Restart all nodes to complete the deinstallation process. 2. If the replacement node is the node on which you originally installed the OSDs, do the following on all nodes: a. Shut down the Oracle instance. b. Stop all Oracle services. c. Uninstall the OSDs from each node by running uninstall OSD, located in the Utilities directory of the installation CD. d. Restart all nodes to complete the deinstallation process. 3. Use the OUI to reinstall the OSDs on each cluster node, including the original nodes and the replacement node. 4. Restart each cluster node to complete the OSD installation process. 5. Verify that Object Link Manager has been installed on the replacement node. See "Installing the Object Link Manager" in Chapter 5, "Installation and Configuration." 6. Install Oracle8i Server with the Oracle8i Parallel Server Option on the replacement node. 7. Restart the replacement node which, upon restart, is now fully integrated into the cluster. 8. At this point, all further operations are specific to Oracle configuration. Refer to the Oracle setup and configuration documentation for information on configuring Oracle software.

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185
  • 186
  • 187
  • 188
  • 189
  • 190
  • 191
  • 192
  • 193
  • 194
  • 195
  • 196
  • 197
  • 198
  • 199
  • 200
  • 201
  • 202
  • 203
  • 204
  • 205
  • 206
  • 207
  • 208
  • 209
  • 210
  • 211
  • 212
  • 213
  • 214
  • 215
  • 216
  • 217
  • 218
  • 219
  • 220
  • 221
  • 222
  • 223
  • 224
  • 225
  • 226
  • 227
  • 228
  • 229
  • 230
  • 231
  • 232
  • 233
  • 234
  • 235
  • 236
  • 237
  • 238
  • 239
  • 240
  • 241
  • 242
  • 243
  • 244
  • 245
  • 246
  • 247

6-20
Compaq Parallel Database Cluster Model PDC/O2000 for Oracle8i and Windows 2000 Administrator Guide
1.
To add a node to the cluster, you must disassemble the existing cluster
and then reform it to include the replacement node. Do the following on
all original cluster nodes (not the replacement node):
a.
Shut down the Oracle instance.
b.
Stop all Oracle services.
c.
Deinstall the OSDs using the OUI from the original installing node.
d.
Restart all nodes to complete the deinstallation process.
2.
If the replacement node
is
the node on which you originally installed the
OSDs, do the following on all nodes:
a.
Shut down the Oracle instance.
b.
Stop all Oracle services.
c.
Uninstall the OSDs from each node by running uninstall OSD,
located in the Utilities directory of the installation CD.
d.
Restart all nodes to complete the deinstallation process.
3.
Use the OUI to reinstall the OSDs on each cluster node, including the
original nodes and the replacement node.
4.
Restart each cluster node to complete the OSD installation process.
5.
Verify that Object Link Manager has been installed on the replacement
node. See
Installing the Object Link Manager
in Chapter 5,
Installation and Configuration.
6.
Install Oracle8
i
Server with the Oracle8
i
Parallel Server Option on the
replacement node.
7.
Restart the replacement node which, upon restart, is now fully integrated
into the cluster.
8.
At this point, all further operations are specific to Oracle configuration.
Refer to the Oracle setup and configuration documentation for
information on configuring Oracle software.