D-Link DGS-3630-28TC Hardware Installation Guide - Page 25
Power On (AC Power), Installing Power Cord Retainer
View all D-Link DGS-3630-28TC manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 25 highlights
DGS-3630 Series Layer 3 Stackable Managed Switch Hardware Installation Guide used to connect devices to the Switch over great distances. The maximum distance that the RJ45 wiring connection can reach is 100 meters. Fiber optic connections can span several kilometers. The figure below illustrates how to properly insert SFP+ transceivers into the Switch's SFP+ ports. Figure 3-4 Inserting transceivers into the transceiver ports The SFP+ ports also support other transceiver form factors like SFP and SFP+ transceivers. A complete list of SFP/SFP+ transceivers, compatible with this switch, can be found the SFP Ports and SFP+ Ports sections in Appendix A - Technical Specifications at the end of this document. Power On (AC Power) Plug one end of the AC power cord into the power socket of the Switch and the other end into the local power source outlet. After the system is powered on, the LED will blink green to indicate that the system is booting up. Power Failure (AC Power) In the event of a power failure, just as a precaution, unplug the power cord from the Switch. After the power returns, plug the power cord back into the power socket of the Switch. Installing Power Cord Retainer To prevent accidental removal of the AC power cord, it is recommended to install the power cord retainer together with the power cord. 1. With the rough side facing down, insert the tie wrap into the hole below the power socket. 25