D-Link DSN-6110 User Manual for DSN-6110 & DSN-6110 with DSN-610 - Page 109
Status, Create multi-path on the replication job, Create multi-path
View all D-Link DSN-6110 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 109 highlights
Figure 5.11.13 3. User can monitor the replication job from the "Status" information and the progress is expressed by percentage. Figure 5.11.14 • Create multi-path on the replication job 1. Click the "Create multi-path" in the operation menu of the replication job. Figure 5.11.15 2. Enter the IP of iSCSI port on controller 2 of the target IP SAN storage. 109
109
Figure 5.11.13
3.
User can monitor the replication job from the
“Status”
information and the progress is
expressed by percentage.
Figure 5.11.14
•
Create multi-path on the replication job
1.
Click the
“Create multi-path”
in the operation menu of the replication job.
Figure 5.11.15
2.
Enter the IP of iSCSI port on controller 2 of the target IP SAN storage.