D-Link DSN-6110 User Manual for DSN-6110 & DSN-6110 with DSN-610 - Page 24
Power on, BBM will work.
View all D-Link DSN-6110 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 24 highlights
1. Shutdown IP SAN storage, then power off. 2. Remove the cover of battery backup module. 3. Insert the battery backup module. 4. Tighten the screws up. 5. Power on, BBM will work. Figure 2.4.1 Figure 2.4.2 24
24
1.
Shutdown IP SAN storage, then power off.
2.
Remove the cover of battery backup module.
3.
Insert the battery backup module.
Figure 2.4.1
4.
Tighten the screws up.
5.
Power on, BBM will work.
Figure 2.4.2