D-Link DSN-6110 User Manual for DSN-6110 & DSN-6110 with DSN-610 - Page 111
Con the replication job to run by schedule, Schedule
View all D-Link DSN-6110 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 111 highlights
Figure 5.11.18 5. A new target will be added in this replication job as a redundancy path. Figure 5.11.19 • Configure the replication job to run by schedule 1. Click "Schedule" in the operation menu of the replication job. Figure 5.11.20 111
111
Figure 5.11.18
5.
A new target will be added in this replication job as a redundancy path.
Figure 5.11.19
•
Configure the replication job to run by schedule
1.
Click
“Schedule”
in the operation menu of the replication job.
Figure 5.11.20