Dell C9000 Line Cards Networking C9010 Getting Started Guide - Page 14
Installing a Rack Bar in a 4-Post Rack
View all Dell C9000 Line Cards manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 14 highlights
3. Install the rack bar on the front posts just below the desired height of the bottom of the chassis. The rack bar requires 1 RU below the chassis. Use the rack bar as a guide to mount the chassis. It is not required to support the weight of the chassis; you can remove it when the chassis is securely mounted in the rack. To install the rack bar, first insert two cage nuts (item 2 in Figure 6) into each post at the desired height. Hold the rack bar (item 1 in Figure 6) so that the smooth side faces outward and the arrows point upward. Align the holes in the rack bar with the cage nuts in the posts. Attach the bar to the frontrack posts using the mounting screws and washers shipped with the rack bar (items 3 and 4 in Figure 6). Tighten each screw to secure the rack bar to the posts. NOTE: The installation procedure in this section describes how to install the C9010 in a 4-post rack using the rack bar provided in the base configuration package. For information about how to use Dell ReadyRails or a rack mount tray to install the C9010, follow the instructions in Installing Dell ReadyRails or Installing a Rack Mount Tray. Then continue with Step 4. Figure 6. Installing a Rack Bar in a 4-Post Rack 14 Installing the Hardware