Dell C9000 Line Cards Networking C9010 Getting Started Guide - Page 8

Installing the Hardware, Installing the Chassis in a Two-Post Threaded-Hole Rack

Page 8 highlights

3 Installing the Hardware To install the C9010 chassis and power up the switch: 1. Install the C9010 chassis in a 2- or 4-post rack using the rack bar and mounting brackets shipped with the chassis, or use an optional rack mount tray or Dell ReadyRails kit. 2. Secure the chassis ground. 3. Install the fan modules. 4. Install RPMs and line cards. 5. Install the power supplies and power cables. 6. Install the cable management system. 7. Install the QSFP+ and SFP+ optics. 8. Connect the power and power up the system. WARNING: Due to the weight of a fully populated C9010 chassis, remove each component before you install or remove the chassis. After you install the switch in a rack and power it up, perform the initial software configuration and connect the switch to a network as described in Configuring the Software. Installing the Chassis in a Two-Post Threaded-Hole Rack You can install the chassis in a 2-post threaded-hole rack by following the tooled procedure in this section. A flat-head and a Philips screwdriver are necessary. WARNING: Use two people, an equipment lift, or pallet jack when lifting or moving the chassis. Install the chassis into the rack before inserting the chassis components. Lift the C9010 chassis only from the bottom. Lifting by the chassis shelves or power supply openings might damage the chassis. WARNING: To prevent bodily injury when mounting or servicing this unit in a rack, take special precautions to ensure that the system remains stable. The following guidelines are provided to ensure your safety: • If your chassis is the only unit in the rack, mount it at the bottom of the rack. • When mounting this unit in a partially filled rack, load the rack from the bottom to the top with the heaviest component at the bottom of the rack. • If the rack is provided with stabilizing devices, install the stabilizers before mounting or servicing the unit in the rack. • If the chassis is shipped with blanks, remove the blanks from each RPM, line card, fan module and PSU slot before lifting the chassis. 1. (Optional) The C9010 chassis is designed to fit into a rack enclosure with the front door closed. If you plan to use cable management brackets (see Installing the Cable Management System ) and 8 Installing the Hardware

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56

3
Installing the Hardware
To install the C9010 chassis and power up the switch:
1.
Install the C9010 chassis in a 2- or 4-post rack using the rack bar and mounting brackets shipped
with the chassis, or use an optional rack mount tray or Dell ReadyRails kit.
2.
Secure the chassis ground.
3.
Install the fan modules.
4.
Install RPMs and line cards.
5.
Install the power supplies and power cables.
6.
Install the cable management system.
7.
Install the QSFP+ and SFP+ optics.
8.
Connect the power and power up the system.
WARNING: Due to the weight of a fully populated C9010 chassis, remove each component before
you install or remove the chassis.
After you install the switch in a rack and power it up, perform the initial software configuration and
connect the switch to a network as described in
Configuring the Software
.
Installing the Chassis in a Two-Post Threaded-Hole Rack
You can install the chassis in a 2-post threaded-hole rack by following the tooled procedure in this
section. A flat-head and a Philips screwdriver are necessary.
WARNING: Use two people, an equipment lift, or pallet jack when lifting or moving the chassis.
Install the chassis into the rack before inserting the chassis components. Lift the C9010 chassis
only from the bottom. Lifting by the chassis shelves or power supply openings might damage the
chassis.
WARNING: To prevent bodily injury when mounting or servicing this unit in a rack, take special
precautions to ensure that the system remains stable. The following guidelines are provided to
ensure your safety:
If your chassis is the only unit in the rack, mount it at the bottom of the rack.
When mounting this unit in a partially filled rack, load the rack from the bottom to the top with
the heaviest component at the bottom of the rack.
If the rack is provided with stabilizing devices, install the stabilizers before mounting or servicing
the unit in the rack.
If the chassis is shipped with blanks, remove the blanks from each RPM, line card, fan module
and PSU slot before lifting the chassis.
1.
(Optional) The C9010 chassis is designed to fit into a rack enclosure with the front door closed. If
you plan to use cable management brackets (see
Installing the Cable Management System
) and
8
Installing the Hardware