Dell Force10 S25N-S50N Installing S50N and S50V Systems - Page 13

Site Preparations, Site Selection, Cabinet Placement

Page 13 highlights

3 Site Preparations This chapter describes requirements and procedures to install your system in the following topics: • Site Selection • Cabinet Placement on page 13 • Rack Mounting on page 14 • Fans and Airflow on page 14 • Power on page 14 • Storing Components on page 16 • Tools Required on page 16 For detailed switch specifications, refer to Chapter , Switch Specifications, on page 47. NOTE: Install the switch into a rack or cabinet before installing any optional components. Site Selection Make sure that the area where you install your switch meets the following safety requirements: • Near an adequate power source. Connect the system to the appropriate branch circuit protection as defined by your local electrical codes. See cautions in Information Symbols and Warnings on page 5. • Environmental temperature between 32° - 122°F (0° - 50°C). • Relative humidity that does not exceed 85% non-condensing. • In a dry, clean, well-ventilated and temperature-controlled room, away from heat sources such as hot air vents or direct sunlight. • Away from sources of severe electromagnetic noise. • Positioned in a rack, cabinet, or on a desktop with adequate space in the front, rear, and sides of the unit for proper ventilation, and access. Cabinet Placement The cabinet must meet the following criteria: • Minimum cabinet size and airflow are according to the EIA standard. • Minimum of 5 inches (12.7 cm) between the side intake and exhaust vents and the cabinet wall. Site Preparations | 13

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64

Site Preparations
|
13
3
Site Preparations
This chapter describes requirements and procedures to install your system in the following topics:
Site Selection
Cabinet Placement on page
13
Rack Mounting on page
14
Fans and
Airflow on page
14
Power on page
14
Storing Components on page
16
T
ools Required on page
16
For detailed switch specifications, refer to
Chapter
, Switch Specifications, on page 47
.
NOTE:
Install the switch into a rack or cabinet before installing any optional components.
Site Selection
Make sure that the area where you install your switch meets the following safety requirements:
Near an adequate power source. Connect the system to the appropriate branch circuit protection as
defined by your local electrical codes. See cautions in
Information Symbols and
W
arnings on page
5
.
Environmental temperature between 32° – 122°F (0° – 50°C).
Relative humidity that does not exceed 85% non-condensing.
In a dry, clean, well-ventilated and temperature-controlled room, away from heat sources such as hot air
vents or direct sunlight.
Away from sources of severe electromagnetic noise.
Positioned in a rack, cabinet, or on a desktop with adequate space in the front, rear, and sides of the unit
for proper ventilation, and access.
Cabinet Placement
The cabinet must meet the following criteria:
Minimum cabinet size and airflow are according to the EIA standard.
Minimum of 5 inches (12.7 cm) between the side intake and exhaust vents and the cabinet wall.