Dell Force10 S25N-S50N Installing S50N and S50V Systems - Page 35
Installing the External Power Shelf (optional),
View all Dell Force10 S25N-S50N manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 35 highlights
• 5'(1.5m) DC-to-DC cable (two versions are included with the rectifier; see below.) • AC cable to the rectifier Installing the External Power Shelf (optional) Installing the PSU in a rack requires the External Power Shelf (EPS) (Catalog# SA-01-EPS), shown in Figure 5-10. It is a 2.5RU chassis that can house up to eight PSUs (for up to eight switches). Figure 5-10. Front and Back Views of External Power Shelf (EPS) Figure 5-11. EPS Mounting Bracket (before inserting PSUs) Shown here on its side, the bracket (rack ear) used for front and rear mounting of the EPS has two holes at one end of the rack flange that are closer together than those at the other end. When attached to the front corners of the EPS, the close-set holes are at the top on the left side of the EPS and at the bottom on the right side of the EPS. To connect to the typical rack, you insert screws through the outside holes on the left-side flange and through the inside holes on the right-side flange. Procedure: 1 Attach the rack ears to the front or rear corners of the EPS, depending on where you are mounting it. 2 For front-mounting the EPC, slide the EPS into the rack from the front until the rack ears are flush with the rack posts. Then secure the EPS by tightening the supplied screws through its left and right rack ears. Figure 5-12 on page 36 shows the EPS mounted below an S50. For rear-mounting the EPC, slide the EPS into the rack from the rear until the rack ears are flush, and Installing Backup Power | 35