HP BL260c HP BladeSystem c-Class Site Planning Guide - Page 45
HP BladeSystem c7000 Enclosure three-phase AC configuration
UPC - 883585668663
View all HP BL260c manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 45 highlights
• N+N redundant, 5kVA enclosure configuration with 24A single-phase PDU HP BladeSystem c7000 Enclosure three-phase AC configuration To cable the enclosure using a three-phase AC configuration: 1. The AC power cables are already attached to the enclosure. 2. Connect the AC power cables to the AC power source. 3. Turn on the AC circuit breakers that power the power cables installed in the enclosure. When the enclosure powers up for the first time, it might take up to 5 minutes before all server blades are initialized and recognized by the Onboard Administrator. The time it takes to complete initialization depends on the number of server blades configured in the enclosure. For example, a full enclosure of 16 server blades might take 5 minutes to power up, while an enclosure with fewer server blades might take less time. Power requirements and considerations 45