Sample installation schedule The following schedule lists the sequence of events for a typical system installation. For situations that prevent following this type of schedule, consider using a milestone schedule. • 60 days before installation o Floor plan design completed and sent to Hewlett-Packard (if required to be an HP task) • 30 days before installation o Primary power and air conditioning installation completed o Telephone and data cables installed o Fire protection equipment installed o Major facility changes completed o Special delivery requirements defined o Site inspection survey completed o Delivery survey completed o A signed copy of the site inspection and delivery survey sent to HP o Site inspection and predelivery coordination meeting arranged with an HP representative to review the inspection checklist and arrange an installation schedule • 7 days before installation o Final check made with an HP site preparation specialist to resolve any last minute problems Sample checklists Customer and Hewlett-Packard information checklist: Customer information Name: Street address: Phone: City or town: State or province: Zip or postal code: Primary customer contact: Secondary customer contact: Traffic coordinator: Hewlett-Packard information Sales representative: Survey representative: Order number: Sample site inspection checklist: No. Computer room Country: Phone: Phone: Phone: Phone: Date: Scheduled delivery date: Yes No Comment or date Preparing for installation 62

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73

Preparing for installation 62
Sample installation schedule
The following schedule lists the sequence of events for a typical system installation. For situations that
prevent following this type of schedule, consider using a milestone schedule.
60 days before installation
o
Floor plan design completed and sent to Hewlett-Packard (if required to be an HP task)
30 days before installation
o
Primary power and air conditioning installation completed
o
Telephone and data cables installed
o
Fire protection equipment installed
o
Major facility changes completed
o
Special delivery requirements defined
o
Site inspection survey completed
o
Delivery survey completed
o
A signed copy of the site inspection and delivery survey sent to HP
o
Site inspection and predelivery coordination meeting arranged with an HP representative to
review the inspection checklist and arrange an installation schedule
7 days before installation
o
Final check made with an HP site preparation specialist to resolve any last minute problems
Sample checklists
Customer and Hewlett-Packard information checklist:
Customer information
Name:
Phone:
Street address:
City or town:
State or province:
Country:
Zip or postal code:
Primary customer contact:
Phone:
Secondary customer contact:
Phone:
Traffic coordinator:
Phone:
Hewlett-Packard information
Sales representative:
Phone:
Survey representative:
Date:
Order number:
Scheduled delivery date:
Sample site inspection checklist:
No.
Yes
No
Comment or date
Computer room