HP Integrity Superdome 2 16-socket HP Integrity Superdome 2 User Service Guide - Page 30

Sample Site Inspection Checklist for Site Preparation, Generic Site Preparation, Guide

Page 30 highlights

You must understand the acoustic noise specifications relative to operator positions within the computer room when adding HP Integrity Superdome 2 systems to computer rooms with existing noise sources. For more information about general site preparation guidelines, see the Generic Site Preparation Guide. Sample Site Inspection Checklist for Site Preparation See Table 16 (page 30) and Table 17 (page 30). You can use these tables to measure your progress. Table 16 Customer and HP Information Customer Information Name: Street address: State or province: Zip or postal code: Primary customer contact: Secondary customer contact: Traffic coordinator: Sales representative Representative making survey Scheduled delivery date Phone number: City or Town: Country Phone number: Phone number: Phone number: HP information Order number: Date: Table 17 Site Inspection Checklist Check either Yes or No. If No, include comment number or date. Computer Room Number Area or condition Yes No 1. Do you have a completed floor plan? 2. Is adequate space available for maintenance needs? Front 36 inches (91.4 cm) minimum and rear 36 inches (91.4 cm) minimum are recommended clearances. 3. Is access to the site or computer room restricted? 4. Is the computer room structurally complete? Expected date of completion? 5. Is a raised floor installed and in good condition? What is the floor to ceiling height? [7.5 ft (228 cm) minimum] 6. Is the raised floor adequate for equipment loading? 7. Are channels or cutouts available for cable routing? 8. Is a network line available? 9. Is a telephone line available? 10. Are customer-supplied peripheral cables and LAN cables available and of the proper type? Comment or Date 30 System specifications

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104

You must understand the acoustic noise specifications relative to operator positions within the
computer room when adding HP Integrity Superdome 2 systems to computer rooms with existing
noise sources.
For more information about general site preparation guidelines, see the
Generic Site Preparation
Guide
.
Sample Site Inspection Checklist for Site Preparation
See
Table 16 (page 30)
and
Table 17 (page 30)
. You can use these tables to measure your
progress.
Table 16 Customer and HP Information
Customer Information
Phone number:
Name:
City or Town:
Street address:
Country
State or province:
Zip or postal code:
Phone number:
Primary customer contact:
Phone number:
Secondary customer contact:
Phone number:
Traffic coordinator:
HP information
Order number:
Sales representative
Date:
Representative making survey
Scheduled delivery date
Table 17 Site Inspection Checklist
Comment or Date
Check either Yes or No. If No, include comment number or date.
Computer Room
No
Yes
Area or condition
Number
Do you have a completed floor plan?
1.
Is adequate space available for maintenance needs? Front 36
inches (91.4 cm) minimum and rear 36 inches (91.4 cm) minimum
are recommended clearances.
2.
Is access to the site or computer room restricted?
3.
Is the computer room structurally complete? Expected date of
completion?
4.
Is a raised floor installed and in good condition? What is the floor
to ceiling height? [7.5 ft (228 cm) minimum]
5.
Is the raised floor adequate for equipment loading?
6.
Are channels or cutouts available for cable routing?
7.
Is a network line available?
8.
Is a telephone line available?
9.
Are customer-supplied peripheral cables and LAN cables available
and of the proper type?
10.
30
System specifications