HP Integrity Superdome 2 16-socket HP Integrity Superdome 2 User Service Guide - Page 85

Troubleshooting fabric issues, Troubleshooting clock related issues

Page 85 highlights

Test complete NOTE: The Test camnet command can be used on a single FRU while all partitions are running. Troubleshooting fabric issues The Superdome 2 system has fabric connections between the following major components: • Blade and XFM modules via enclosure upper backplane. • IOX and XFM modules using J-LINK cables • XFM and XFM modules using J-LINK cables (B32s only) To determine the healthy status for all crossbar connections, use the command HR> test fabric: IMPORTANT: The HR> test fabric requires complex outage. Before running HR> test fabric, all indicted and deconfigured parts must be cleared and the partitions (nPar and vPar) must be powered off. NOTE: Test fabric includes both test camnet and test clocks. OA1 HR> test fabric Begin test 1: System Fabric Components Acquitting any current fabric and CAMNet indictments, and deconfigurations. Beginning fabric test SUCCESS: System Fabric test complete System Fabric routed successfully. Begin test 2: Management Network Components CAMNet test has executed without finding faults Management connectivity test complete Begin test 3: Global Clock Components Clocks test started... Blade ========== Blade 1/1 Blade 1/2 Blade 1/3 Blade 1/4 Blade 1/5 Blade 1/6 Blade 1/7 Blade 1/8 Sys Clk 0 ========== OK OK OK OK OK OK OK OK Sys Clk 1 ========== OK OK OK OK OK OK OK OK GPSM ========== GPSM 1/1 * GPSM 1/2 * Int Clk ========== OK OK Ext Clk ========== ------- SUCCESS: Clocks test passed. Clocks test complete. Success: Fabric, CAMNet, and Global Clock tests completed with no errors Troubleshooting clock related issues Clocks are provided by the GPSM module and are redundant within a complex. Use the command HR> test clocks to check for clock related issues: NOTE: This command can be run while the partitions are active. HR> test clocks Troubleshooting fabric issues 85

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104

Test complete
NOTE:
The
Test camnet
command can be used on a single FRU while all partitions are running.
Troubleshooting fabric issues
The Superdome 2 system has fabric connections between the following major components:
Blade and XFM modules via enclosure upper backplane.
IOX and XFM modules using J-LINK cables
XFM and XFM modules using J-LINK cables (B32s only)
To determine the healthy status for all crossbar connections, use the command
HR> test fabric
:
IMPORTANT:
The
HR> test fabric
requires complex outage. Before running
HR> test
fabric
, all indicted and deconfigured parts must be cleared and the partitions (nPar and vPar)
must be powered off.
NOTE:
Test fabric
includes both
test camnet
and
test clocks
.
OA1 HR> test fabric
Begin test 1: System Fabric Components
Acquitting any current fabric and CAMNet indictments, and deconfigurations.
Beginning fabric test
SUCCESS: System Fabric test complete
System Fabric routed successfully.
Begin test 2: Management Network Components
CAMNet test has executed without finding faults
Management connectivity test complete
Begin test 3: Global Clock Components
Clocks test started...
Blade
Sys Clk 0
Sys Clk 1
==========
==========
==========
Blade 1/1
OK
OK
Blade 1/2
OK
OK
Blade 1/3
OK
OK
Blade 1/4
OK
OK
Blade 1/5
OK
OK
Blade 1/6
OK
OK
Blade 1/7
OK
OK
Blade 1/8
OK
OK
GPSM
Int Clk
Ext Clk
==========
==========
==========
GPSM 1/1 *
OK
----
GPSM 1/2 *
OK
----
SUCCESS: Clocks test passed.
Clocks test complete.
Success: Fabric, CAMNet, and Global Clock tests completed with no errors
Troubleshooting clock related issues
Clocks are provided by the GPSM module and are redundant within a complex. Use the command
HR> test clocks
to check for clock related issues:
NOTE:
This command can be run while the partitions are active.
HR> test clocks
Troubleshooting fabric issues
85