Intel MFSYS25 User Guide - Page 34
Installing Temporary Handles on System,
UPC - 735858196901
View all Intel MFSYS25 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 34 highlights
• The Intel® Modular Server System MFSYS25/MFSYS35 can only be installed in a rack cabinet with perforated front and rear doors. • Plan device installation starting with the bottom of the rack cabinet. • Do not leave unused space within the rack cabinet opening; blank filler panels must be used to fill gaps and prevent recirculation of warm air. • Ensure the power outlets in the rack are sufficient in quantity and load capacity to support all devices intended to be installed in the rack. Installing Temporary Handles on System Temporary handles are provided with your Intel® Modular Server System. These handles are intended to aid in the movement of the system during removal from packaging and during initial configuration and installation. However, the profile of the handles is such that it prevents their use when the system is installed in a standard 19-inch rack. To install the temporary handles on the system, follow these steps: 1. Mount the handles to the top edges of both the front and rear of the system. 2. Insert the handle tabs of each front and rear handle into the chassis slots and tighten captive screws. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 1 I/O 2 1 2 ID 1 2 3 4 5 1 I/O 2 1 2 ID 6 AF002418 Figure 9. Installing Temporary Handles The system can now be moved as required to aid in removal from packaging, installation of the remaining modules in the system, or installation of the system in a rack. 18 Intel® Modular Server System User Guide