LiftMaster CSW24VDC CSW24VDC Installation Manual - Page 44
Step 1 Determine Location For Concrete Pad And Operator-compact Installation Only
View all LiftMaster CSW24VDC manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 44 highlights
APPENDIX STEP 1 DETERMINE LOCATION FOR CONCRETE PAD AND OPERATOR COMPACT INSTALLATION ONLY DO NOT run the operator until instructed. Refer to the illustration to determine the measurements and location of the concrete pad. NOTE: When lifting the operator use the handle to avoid damaging the operator. TOP VIEW OF OPERATOR AND GATE 4" (10.2 cm) maximum Gate Hinge Center NOTE: There should only be a maximum of 4" (10.2 cm) from the center of the hinge to the edge of the post or column. If the distance is greater than 4" (10.2 cm) entrapment protection for this area is required. Gate Open 90° 26-1/2" Output Shaft Center 9" 28" Handle STEP 2 CONCRETE PAD AND OPERATOR ATTACHMENT COMPACT INSTALLATION ONLY Check the national and local building codes before installation. 1. Install the electrical conduit. 2. Pour a concrete pad (reinforced concrete is recommended). The concrete pad should be 6 inches above the ground and deeper than the frost line. Ensure the pad is tall enough to avoid possible flooding. 3. Secure the operator to the concrete pad with appropriate fasteners. NOTE: An alternative to a concrete pad is to post mount the operator (refer to accessories). CONDUIT LOCATION 5.5" 4.5" 1" 6.5" 4" 1.5" (Conduit) 3" 10" 28" 20" MOUNTING FOOTPRINT 13.6" 12.2" 6.1" 2.49" 14" 15" (Pad) 24" 14.82" (cover mounting distance) 43 3 4 Concrete Anchors 1/2" x 3 1/2" 1 28" 24" 24"-32" Post Mount 2 24" 6" Above Ground Below the frost line. Check all national and local codes.