LiftMaster CSW24VDC CSW24VDC Installation Manual - Page 50

Sams Wiring With Relays Not Energized, Expansion Board, Main Control Board

Page 50 highlights

APPENDIX SAMS WIRING WITH RELAYS NOT ENERGIZED Main Board Exit Input Barrier Arm Operator C Auxiliary Command NO COM LINK BA AC & BATT FAIL BACKDRIVE Expansion Board SHADOW INTERUPT EXIT OPEN CLOSE POWER TO MAIN BOARD DEVICE INPUTS 1 EYE ONLY 2 EYE/ EDGE 3 EYE/ EDGE COM SBC OPN CLS STP COM Shadow Input Access Device Dipswitch settings for AUX Relay 1: 1-OFF, 2-OFF, 3-ON AUX Relay 1 DUAL GATE SETTINGS NOTE: We recommend that all accessories and board configurations are set on the primary operator. MAIN CONTROL BOARD FEATURE PRIMARY OPERATOR SECONDARY OPERATOR ACCESSORY PRIMARY OPERATOR Timer-toClose Bi-Part Delay Switch Set the TTC dial to desired setting Bi-Part Delay: ON (will open last & close first) Tandem Mode: OFF Synchronized Close: ON OFF Bi-Part Delay: OFF (will open first & close last) Tandem Mode: OFF Synchronized Close: ON EXPANSION BOARD Remote Controls Program remote controls 1 to 50 to the primary operator. LiftMaster Program to primary Internet Gateway operator. Garage and Gate Program to primary Monitor operator. SECONDARY OPERATOR Program remote controls 51 to 100 to the secondary operator FEATURE PRIMARY OPERATOR QUICK CLOSE Switch ANTI-TAIL Switch LOW BATT Switch AC FAIL OPEN/BATT Switch ON ON Battery Fail OPEN: OPEN Battery Fail CLOSE: CLOSE OPEN SECONDARY OPERATOR OFF OFF Battery Fail OPEN: OPEN Battery Fail CLOSE: CLOSE OPEN 49

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56

49
APPENDIX
FEATURE
PRIMARY OPERATOR
SECONDARY
OPERATOR
QUICK CLOSE
Switch
ON
OFF
ANTI-TAIL Switch
ON
OFF
LOW BATT Switch
Battery Fail OPEN:
OPEN
Battery Fail CLOSE:
CLOSE
Battery Fail OPEN:
OPEN
Battery Fail CLOSE:
CLOSE
AC FAIL OPEN/BATT
Switch
OPEN
OPEN
FEATURE
PRIMARY OPERATOR
SECONDARY OPERATOR
Timer-to-
Close
Set the TTC dial to desired
setting
OFF
Bi-Part Delay
Switch
Bi-Part Delay: ON (will
open last & close first)
Tandem Mode: OFF
Synchronized Close: ON
Bi-Part Delay: OFF (will
open first & close last)
Tandem Mode: OFF
Synchronized Close: ON
ACCESSORY
PRIMARY OPERATOR
SECONDARY
OPERATOR
Remote Controls
Program remote controls
1 to 50 to the primary
operator.
Program remote
controls 51 to 100 to
the secondary operator
LiftMaster
Internet Gateway
Program to primary
operator.
Garage and Gate
Monitor
Program to primary
operator.
AC & BATT FAIL
BACKDRIVE
COM
LINK
B
A
SHADOW
INTERUPT
EXIT
SBC
OPN
CLS
STP
COM
EYE
ONLY
EYE/
EDGE
EYE/
EDGE
COM
1
2
3
OPEN
CLOSE
TO MAIN
BOARD
POWER
Access Device
Exit Input
Shadow Input
AUX Relay 1
C
NO
Auxiliary
Command
Dipswitch settings for AUX
Relay 1: 1-OFF, 2-OFF, 3-ON
Main Board
Expansion Board
Barrier Arm Operator
SAMS WIRING WITH RELAYS NOT ENERGIZED
EXPANSION BOARD
DUAL GATE SETTINGS
NOTE:
We recommend that all accessories and board configurations are set on the primary operator.
MAIN CONTROL BOARD