LiftMaster CSW24VDC CSW24VDC Installation Manual - Page 45
Step 3 Shorten The Operator Arm -compact Installation Only
View all LiftMaster CSW24VDC manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 45 highlights
APPENDIX STEP 3 SHORTEN THE OPERATOR ARM 1 COMPACT INSTALLATION ONLY For a compact installation the operator arm will have to be shortened. 1. Take the operator arm apart and remove the inner sleeves from the outer tubing. CUT long arm section CUT 2. Cut the outer tubing of the operator arm sections to the lengths shown. 2 10" 22" 4" 3. Put the arm back together and adjust the arm to the measurements as CUT short arm section shown. Use the set screws on the arm to temporarily hold the arm in place while determining the correct measurements. 4" 20" STEP 4 POSITION THE GATE BRACKET COMPACT INSTALLATION ONLY NOTE: It may be necessary to attach horizontal reinforcement to the gate before attaching the gate bracket. Use the set screws on the arm to temporarily hold the arm in place while determining the correct measurements. 1. Position the operator arm onto the output shaft so that the pin slides into the slot. 2. Measure 33 inches along the gate length from the gate hinge center. 3. Measure 27.5 inches up from the concrete pad to the gate hinge position on the gate as shown. 4. Make sure the operator arm is level and tack weld the gate bracket in this position. Proceed to Step 5 of the installation. 2 33" 3 Gate Hinge Center Set Screws 23" 25-1/2" 1 Slot 4 3 Set Screws 27.5" Output Shaft Pin Tack weld 44