Maytag MDB6709AWQ Installation Instructions - Page 9
withalarge
UPC - 883049154343
View all Maytag MDB6709AWQ manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 9 highlights
1C. onnebclat cekndofofdraihnosteowaste teeandcutifneeded. (Donoct utribbesdection.) 2.Attacbhlacekndofdraihnosteowastteee withalargseilvedrraihnoscelam(pprovided). Usepliertsosqueeczleamoppeanndmove intopositioIfnth. edraihnosweascutusea 1Wto' 2"(3.8to5cms)crew-tycplaem(pnot provided). Option C, Waste disposer = with air gap 1. Connect black end of drain hose to air gap and cut if needed. (Do not cut ribbed section.) 2. Attach drain hose to air gap with large silver drain hose clamp (provided). Use pliers to squeeze clamp open and move into position. If the drain hose was cut, use a 11A" to 2" (3.8 to 5 cm) screw-type clamp (not provided). 3. Use a rubber hose (not provided) with screw-type clamps (not provided) to connect from waste tee to air gap. Drain trap 1. Using a hammer and screwdriver, knock plug into disposer. 2. Use needle-nose pliers to remove plug. 3. Connect black end of drain hose to air gap and cut if needed. (Do not cut ribbed section.) 4. Attach drain hose to air gap with large silver drain hose clamp (provided). Use pliers to squeeze clamp open and move into position. If the drain hose was cut, use a 11/2" to 2" (3.8 to 5 cm) screw-type clamp (not provided). 5, Use a rubber hose (not provided)with screw-type clamps (not provided) to connect from air gap to disposer inlet.