Tripp Lite 9PX11K Eaton 9PX 8000 9PX 11000 9PX EBM 240V Installation and User - Page 19
Tower installation
View all Tripp Lite 9PX11K manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 19 highlights
ENGLISH 3. Installation 3.6 Tower installation If you ordered other UPS accessories, refer to specific user manuals to check the tower installation with the UPS. To install the cabinet: 1. Place the UPS on a flat, stable surface in its final location. 2. Always keep 150 mm of free space behind the UPS rear panel. 3. If installing additional cabinets, place them next to the UPS in their final location. • Adjustment of the orientation of the LCD panel and of the logo. • Adjustment of the angle of vision of the LCD panel. 8-11kVA US_EN Page 19
Page 19
8-11kVA US_EN
ENGLISH
3. Installation
3.6
Tower installation
•
Adjustment of the orientation of the LCD panel and of the logo.
•
Adjustment of the angle of vision of the LCD panel.
If you ordered other UPS accessories, refer to specific user manuals to check the tower installation
with the UPS.
To install the cabinet:
1.
Place the UPS on a flat, stable surface in its final location.
2.
Always keep 150 mm of free space behind the UPS rear panel.
3.
If installing additional cabinets, place them next to the UPS in their final location.