Tripp Lite 9PX11K Eaton 9PX 8000 9PX 11000 9PX EBM 240V Installation and User - Page 22

Installation requirements

Page 22 highlights

3. Installation 3.8 Installation requirements Recommended protective devices and cable cross-sections 1. Recommended upstream protection UPS power rating 8000VA 11000VA Upstream circuit breaker D curve - 50A D curve - 70A 2 poles circuit breaker L1 N(L2) to UPS Normal AC / Bypass AC source G N(L2) L1 Read the Safety instructions page 3 regarding backfeed protection requirements. 2. Recommended cable cross-sections Terminal position L1 N(L2) Wire function Phase Neutral (Phase) Ground Terminal wire size rating 4-25 mm2 (12-4 AWG) Copper wire, solid or stranded. Minimum input wire size 10 mm² (8 AWG) 105°C 16 mm2 (6 AWG) 90°C Tightening torque 18 lb in / 2.03 Nm Page 22 8-11kVA US_EN

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46

Page 22
8-11kVA US_EN
3.8
Installation requirements
Recommended protective devices and cable cross-sections
1.
Recommended upstream protection
UPS power rating
Upstream circuit breaker
8000VA
D curve – 50A
11000VA
D curve – 70A
2 poles circuit breaker
G N(L2) L1
N(L2)
L1
to UPS Normal AC / Bypass AC source
Read the Safety instructions page 3 regarding backfeed protection requirements.
2.
Recommended cable cross-sections
Terminal
position
Wire
function
Terminal wire
size rating
Minimum input
wire size
Tightening
torque
L1
Phase
4-25 mm
2
(12-4 AWG)
10 mm² (8 AWG) 105°C
16 mm
2
(6 AWG) 90°C
18 lb in / 2.03 Nm
N(L2)
Neutral
(Phase)
Ground
Copper wire, solid or stranded.
3. Installation