Weider Weevsy3426 Uk Manual - Page 17

Attach the Thin Pulley inside the Top Frame

Page 17 highlights

20. Wrap the High Cable (55) under a 90mm Pulley (48). Attach the Pulley and two Half Guards (43) 20 at the upper hole in the Adjustable U-bracket (45) with an M10 x 45mm Bolt (81) and an M10 Locknut (56). Make sure that the Half Guards are on the outside of the Adjustable U- bracket. 21. Route the High Cable (55) up through the Top Frame (4) and over a 90mm Thin Pulley (47). 21 Attach the Thin Pulley inside the Top Frame with the M10 x 80mm Bolt (71) used in step 19, a 19mm Spacer (33), an M10 Washer (57), and an M10 Locknut (56). 55 56 43 48 43 81 45 55 56 33 47 4 57 71 22. Route the High Cable (55) over a 90mm Pulley (48) and down through the Top Frame (4). 22 Attach the Pulley inside the Top Frame with an M10 x 80mm Bolt (71), two M10 Washers (57), two 19mm Spacers (33), and an M10 Locknut (56). 56 33 57 4 48 55 33 57 71 17

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32

17
20. Wrap the High Cable (55) under a 90mm Pulley
(48). Attach the Pulley and two Half Guards (43)
at the upper hole in the Adjustable U-bracket
(45) with an M10 x 45mm Bolt (81) and an M10
Locknut (56).
Make sure that the Half Guards
are on the outside of the Adjustable U-
bracket.
21. Route the High Cable (55) up through the Top
Frame (4) and over a 90mm Thin Pulley (47).
Attach the Thin Pulley inside the Top Frame
with the M10 x 80mm Bolt (71) used in step 19,
a 19mm Spacer (33), an M10 Washer (57), and
an M10 Locknut (56).
20
21
81
56
48
55
43
43
45
55
47
71
4
33
57
56
22. Route the High Cable (55) over a 90mm Pulley
(48) and down through the Top Frame (4).
Attach the Pulley inside the Top Frame with an
M10 x 80mm Bolt (71), two M10 Washers (57),
two 19mm Spacers (33), and an M10 Locknut
(56).
22
71
55
33
33
48
57
4
57
56