Weider Weevsy3426 Uk Manual - Page 19

Make sure that the Half Guards are on, the outside of the bracket as shown., sure that the Half

Page 19 highlights

26. Attach a 90mm Pulley (48) inside the Upright (3), over the Low Cable (53), with an M10 x 26 80mm Bolt (71), two M10 Washers (57), two 19mm Spacers (33), and an M10 Locknut (56). 56 33 57 48 53 3 57 33 71 27. Route the Low Cable (53) over a 90mm Pulley (48). Attach the Pulley and two Half Guards (43) to the Double U-bracket (63) with an M10 x 45mm Bolt (81) and an M10 Locknut (56). Make sure that the Half Guards are on the outside of the Double U-bracket as shown. 27 56 43 53 28. Route the Low Cable (53) under a 90mm Pulley (48). Insert an M10 x 55mm Bolt (66) through two Half Guards (43), the Base (1), and the Pulley. Make sure that the Half Guards are on the outside of the bracket as shown. 28 43 63 48 43 81 53 48 66 1 43 19

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32

19
26. Attach a 90mm Pulley (48) inside the Upright
(3), over the Low Cable (53), with an M10 x
80mm Bolt (71), two M10 Washers (57), two
19mm Spacers (33), and an M10 Locknut (56).
28. Route the Low Cable (53) under a 90mm Pulley
(48). Insert an M10 x 55mm Bolt (66) through
two Half Guards (43), the Base (1), and the
Pulley.
Make sure that the Half Guards are on
the outside of the bracket as shown.
27. Route the Low Cable (53) over a 90mm Pulley
(48). Attach the Pulley and two Half Guards (43)
to the Double U-bracket (63) with an M10 x
45mm Bolt (81) and an M10 Locknut (56).
Make
sure that the Half Guards are on the outside
of the Double U-bracket as shown.
26
27
28
56
3
53
33
33
57
57
48
71
56
53
48
43
43
63
81
53
48
43
1
43
66