Zenith XBV613 Service Manual - Page 84
Arm Assembly Tension Fig. A-4-2, Reel S/Reel T Fig. A-4-3
UPC - 719192169715
View all Zenith XBV613 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 84 highlights
DISASSEMBLY AND ASSEMBLY OF DECK MECHANISM Arm Assembly Tension (Fig. A-4-2) (H7) Spring Tension Reel S (Fig. A-4-3) Spring Tension Reel T (Fig. A-4-3) Brake Assembly T (Fig. A-4-1) (H8) (H6) Fig. A-4 13. Brake Assembly T (Fig. A-4-1) 1) Release the spring tension from the lever spring hook (H6). 2) Disassemble the brake assembly T while holding it upward. 14. Arm Assembly Tension (Fig. A-4-2) 1) Release the spring tension the hook (H7) from the arm assembly tension. 2) After releasing the hook (H8) of the base tension, separate it while holding it up. CAUTIONS Spring used for both brake assembly T and arm assembly tension is used (2EA used). 15. Reel S/Reel T (Fig. A-4-3) 1) Disassemble the reel S/ reel T while holding it up (comparison between Reel S and Reel T) Reel S Reel T 4-6