Alcatel OS6602-24 Getting Started Guide - Page 23

Important., Anti-Static Warning., Note., the two Phillips attachment screws. After the attachment

Page 23 highlights

If uplink modules and/or stacking kits were specified with your order, install them now by following the steps below: Important. Stacking modules can only be installed in the far-right module slot. This slot is labeled EXPANSION/ STACKING and contains port positions 27 and 28 (OS6624 and OS6600-U24) or 51 and 52 (OS6648). Do not attempt to install stacking modules at the EXPANSION slot at port positions 25 and 26 (OS6624 and OS6600-U24) or 49 and 50 (OS6648). OS6600-GNI-U2 and OS6600-GNI-C2 uplink modules can be installed in either slot location. However, if you install a Gigabit Ethernet uplink module in the EXPANSION/STACKING slot, the switch must be used as a stand-alone unit. Port numbers are clearly marked on the OmniSwitch 6600 Family chassis front panels. Anti-Static Warning. Before handling any components, free yourself of static by wearing a grounding strap, or by grounding yourself properly. Static discharge can damage the switch and the uplink or stacking module. 1 If there is a blank cover panel installed over the uplink or stacking module slot position, uninstall it by removing the two Phillips attachment screws. After the attachment March 2005 screws have been removed, carefully pry the blank cover panel out and away from the chassis. Set the cover panel and attachment screws aside. 2 Holding the uplink or stacking module by the front panel, carefully slide the circuit board into the card guide located in the chassis slot. EXPANSION/STAC5 2KING 51 LINK/ACT LINK/ACT Note. The module should slide in easily. Do not force the module into the slot. If any resistance is encountered, ensure that the module is aligned properly in the card guide and try again. Setting Up the Hardware 17

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76

March 2005
Setting Up the Hardware
17
If uplink modules and/or stacking kits were specified with
your order, install them now by following the steps below:
Important.
Stacking modules can only be installed in the
far-right module slot. This slot is labeled EXPANSION/
STACKING and contains port positions 27 and 28
(OS6624 and OS6600-U24) or 51 and 52 (OS6648).
Do not
attempt to install stacking modules at the
EXPANSION slot at port positions 25 and 26 (OS6624
and OS6600-U24) or 49 and 50 (OS6648).
OS6600-GNI-U2 and OS6600-GNI-C2 uplink modules
can be installed in either slot location. However, if you
install a Gigabit Ethernet uplink module in the
EXPANSION/STACKING slot, the switch must be used
as a stand-alone unit.
Port numbers are clearly marked on the OmniSwitch 6600
Family chassis front panels.
Anti-Static Warning.
Before handling any components,
free yourself of static by wearing a grounding strap, or by
grounding yourself properly. Static discharge can damage
the switch and the uplink or stacking module.
1
If there is a blank cover panel installed over the uplink
or stacking module slot position, uninstall it by removing
the two Phillips attachment screws. After the attachment
screws have been removed, carefully pry the blank cover
panel out and away from the chassis. Set the cover panel
and attachment screws aside.
2
Holding the uplink or stacking
module by the front
panel, carefully slide the circuit board into the card guide
located in the chassis slot.
Note.
The module should slide in easily. Do not force the
module into the slot. If any resistance is encountered,
ensure that the module is aligned properly in the card
guide and try again.
EXPANSION/STACKING
51
52
LINK/ACT
LINK/ACT