Bowflex Xtreme 2 Assembly Manual - Page 17
Step 19 - Cable &, Pulley Routing
View all Bowflex Xtreme 2 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 17 highlights
15 Step 19 - Cable & Pulley Routing Connect Rod Cables through the Right (3) Floating and Lat Tower Pulleys Locate the following items: • 3 & 8 Floating Pulleys (connected unit) • (2) Cable End Stop Balls with Core (see Detail 19b). Figure 19 - Lat Tower Pulleys Cable End Stop Ball Take the Right Rod Cable that you ran through the Lat Pulley Housing and thread that Cable through the (3) Floating Pulley, as shown in Figure 19. Lat Tower Pulleys Continue to guide that Cable up through the (4) Pulley on the Rear Lat Cross Bar, and then through the (5) Pulley on the Front Lat Cross Bar, as shown. Finally, insert the Cable End through the Cable End Stop Ball and then attach the Cable Core to keep the Cable from slipping back through the Pulleys, as shown in Figure 19b. Right Rod Cable NOTE: The Cable End Stop Ball Core should fit over the Ferrule when installed correctly. Rotate the Core to align it with the groove in the Ball. Floating Pulley