Bowflex Xtreme 2 Assembly Manual - Page 6

Assembly Guide

Page 6 highlights

 Assembly Guide Step 1: Assemble the Base Frame Assembly Locate the following items: Figure 1 • Item #1 - Standing Platform • Item #2 - Right Frame Rail • Item #3 - Left Frame Rail • Item #4 - Rear Cross Bar • Item #F - (6) 3/8" X 3/4" Hex Head Bolts • Item #O - (6) 3/8" Washers Do not unwrap cables. Place the Standing Platform (Item #1) onto the floor, wide end facing you. Line up and insert the connectors from the Right Frame Rail (Item #2) into the right side of the Standing Platform, as shown in Figure 1. 4 F O Place (2) 3/8" Washers (Item #O) over the end of (2) 3/8" X 3/4" Hex Head Bolts (Item #F) - one washer per bolt. Insert bolts through the holes in the Base Frame and Frame Rail (see Figure 1). Do not tighten at this time. Line up the Rear Cross Bar (Item #4) with the Right Frame 1 Rail. Insert connector from the Frame Rail into the end of the Cross Bar. Place (1) 3/8" washer over (1) 3/8" X 3/4" Hex Head Bolt. Loosely insert the bolt into the corresponding holes in the Rear Cross Bar and Right Frame Rail. Repeat above process with Left Frame Rail (Item #3). Do not tighten hardware from Step 1 at this time. Step 2: Attach Power Rod® Box to the Lower Lat Tower Locate the following items: • Item #5 - Lower Lat Tower • Item #6 - Rod Box with Power Rod® Unit • Item #B - (3) #10 X 1" Self Drilling Screws • Item #M - (3) 1/4" Washers Figure 2 5 Lay the Rod Box w/ Power Rod® Unit (Item #6) on the floor facing the Lower Lat Tower (Item #5) as shown in Figure 2. Slide the Rod Box into the Rod Box Frame firmly. Larger Rods should be inserted into Rod Box Frame first. Place (3) 1/4" Washers (Item #M) over the end of (3) #10 X 1" Self Drilling Screws (Item #B) - one washer per screw. Completely secure the Rod Box to the Frame with the screws and washers as shown in Figure 2. M B Tighten all hardware from Step 2 only at this time. F O 2 6

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23

4
Step 1:
Assemble the Base Frame Assembly
Locate the following items:
Item #1
- Standing Platform
Item #2
- Right Frame Rail
Item #3
- Left Frame Rail
Item #4
- Rear Cross Bar
Item #F
- (6) 3/8" X 3/4" Hex Head Bolts
Item #O
- (6) 3/8" Washers
Do not unwrap cables.
Place the Standing Platform (Item #1) onto the floor, wide
end facing you.
Line up and insert the connectors from
the Right Frame Rail (Item #2) into the right side of the
Standing Platform, as shown in
Figure 1
.
Place (2) 3/8" Washers (Item #O) over the end of (2) 3/8"
X 3/4" Hex Head Bolts (Item #F) - one washer per bolt.
Insert bolts through the holes in the Base Frame and Frame
Rail (see
Figure 1
).
Do not tighten at this time.
Line up the Rear Cross Bar (Item #4) with the Right Frame
Rail.
Insert connector from the Frame Rail into the end of
the Cross Bar.
Place (1) 3/8" washer over (1) 3/8” X 3/4"
Hex Head Bolt. Loosely insert the bolt into the corresponding
holes in the Rear Cross Bar and Right Frame Rail.
Repeat above process with Left Frame Rail (Item #3).
Do not tighten hardware from Step 1 at this time.
Step 2:
Attach Power Rod® Box to the Lower Lat Tower
Locate the following items:
Item #5
- Lower Lat Tower
Item #6
- Rod Box with Power Rod® Unit
Item #B
- (3) #10 X 1" Self Drilling Screws
Item #M
- (3) 1/4" Washers
Lay the Rod Box w/ Power Rod® Unit (Item #6) on the
floor facing the Lower Lat Tower (Item #5) as shown in
Figure 2
.
Slide the Rod Box into the Rod Box Frame firmly.
Larger Rods should be inserted into Rod Box Frame first.
Place (3) 1/4" Washers (Item #M) over the end of (3) #10
X 1" Self Drilling Screws (Item #B) - one washer per screw.
Completely secure the Rod Box to the Frame with the
screws and washers as shown in
Figure 2.
Tighten all hardware from Step 2 only at this time.
Figure 1
O
1
4
2
F
O
M
5
6
Figure 2
B
Assembly Guide
F