Bowflex Xtreme 2 Assembly Manual - Page 18

Step 19c - Cable & Pulley Routing, Step 19b - Cable & Pulley Routing

Page 18 highlights

Step 19b - Cable & Pulley Routing Connect Cable End Stop Ball with Core Figure 19b - Cable End Stop Ball with Core Cable End Stop Ball Ferrule Cable Core Step 19c - Cable & Pulley Routing Connect Rod Cables through Left (3) Floating and Lat Tower Pulleys Repeat with Left Rod Cables and (3) & (8) Floating Pulleys as shown in Figure 19c. NOTE: Once the Cable End Stop Balls are attached, hook each Rod Hook onto the Lat Pulley Housing as shown in Figure 19d. Figure 19c - Lat Tower Pulleys Cable End Stop Ball Lat Tower Pulleys Left Rod Cable Figure 19d - Rod Hooks Storage on Lat Pulley Housing Floating Pulley

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23

Figure 19b - Cable End
Stop Ball with Core
Ferrule
Cable End Stop Ball
Cable Core
Figure 19d - Rod
Hooks Storage on Lat
Pulley Housing
Step 19c - Cable & Pulley Routing
Connect Rod Cables through Left (3) Floating
and Lat Tower Pulleys
Repeat with Left Rod Cables and (3) & (8)
Floating Pulleys as shown in
Figure 19c
.
NOTE: Once the Cable End Stop Balls are attached,
hook each Rod Hook onto the Lat Pulley Housing as
shown in Figure 19d.
Figure 19c - Lat Tower Pulleys
Step 19b - Cable & Pulley Routing
Connect Cable End Stop Ball with Core
Floating Pulley
Lat Tower Pulleys
Cable End
Stop Ball
Left Rod Cable