Bowflex Xtreme 2 Assembly Manual - Page 8

Step 5: Install the Right and Left Squat Frame Rails - assembly

Page 8 highlights

 Step 5: Install the Right and Left Squat Frame Rails Locate the following items: • Item #8 - Right Squat Frame Rail • Item #9 - Left Squat Frame Rail • Item #10 - Right Squat Frame Foot Assembly • Item #11 - Left Squat Frame Foot Assembly • Item #34 - 6 Squat Pulley (Squat/Arm Right Cable) • Item #35 - 6 Squat Pulley (Squat/Arm Left Cable) • From Step 4 - Main Assembly • Item #F - (4) 3/8" X 3/4" Hex Head Bolts • Item #G - (2) 3/8" X 1" Hex Head Bolts • Item #I - (1) 3/8" X 5" Hex Head Bolt • Item #O - (8) 3/8" Washers • Item #R - (1) 3/8" Nylock Nut Do not unwrap cables. Before you install the Squat Frame Rails, slide the 6 Squat Pulley (Item #34) over the end of the Right Squat Frame Rail (Item #8), and the 6 Squat Pulley (Item #35) over the end of the Left Squat Frame Rail (Item #9), see Figure 5. Line up the holes in the brackets on the Right Squat Frame Rail (Item #8) and Left Squat Frame Rail (Item #9) with the holes in the Seat Support Rail (Item #7) as shown in Figure 5. Place (1) 3/8" Washer (Item #O) over the end of (1) 3/8" X 5" Hex Head Bolt (Item #I), and slide the bolt through the upper bolt hole in the Left Squat Frame Rail, Seat Rail and Right Squat Frame Rail, as shown in Figure 5. Place (1) 3/8" Washer (Item #O) and (1) 3/8" Nylock Nut (Item #R) over the end of the bolt to secure it. Then, place (2) 3/8" Washers (Item #O) over the ends of (2) 3/8" X 3/4" Hex Head Bolts (Item #G) and attach the Squat Frame Rails more securely by screwing these through the lower holes in the Squat Frame Rails and Seat Rail, as shown in Figure 5. Next, (see Figure 5a) slide the Right Squat Frame Foot Assembly (Item #10) into the connectors on the Right Frame Rail (Item #2) and the Right Squat Frame Rail. Secure the Foot Assembly using (2) 3/8" X 3/4" Hex Head Bolts (Item #F) and (2) 3/8" Washers (Item #O). Repeat this process for the Left Squat Frame Foot Assembly (Item #11). Note: You will need to lift the machine to install the Squat Frame Foot Assemblies. Tighten all hardware from Step 5 only at this time. Figure 5 I O 7 9 Figure 5a F 9 35 11 34 10 R G 8 2 O 8

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23

Step 5: Install the Right and Left Squat Frame Rails
Locate the following items:
Item #8
- Right Squat Frame Rail
Item #9
- Left Squat Frame Rail
Item #10
- Right Squat Frame Foot Assembly
Item #11
- Left Squat Frame Foot Assembly
Item #34
- 6 Squat Pulley (Squat/Arm Right Cable)
Item #35
- 6 Squat Pulley (Squat/Arm Left Cable)
• From
Step 4
- Main Assembly
Item #F
- (4) 3/8" X 3/4" Hex Head Bolts
Item #G
- (2) 3/8" X 1" Hex Head Bolts
Item #I
- (1) 3/8" X 5" Hex Head Bolt
Item #O
- (8) 3/8" Washers
Item #R
- (1) 3/8" Nylock Nut
Do not unwrap cables.
Before you install the Squat Frame Rails, slide the 6 Squat
Pulley (Item #34) over the end of the Right Squat Frame
Rail (Item #8), and the 6 Squat Pulley (Item #35) over the
end of the Left Squat Frame Rail (Item #9), see
Figure 5
.
Line up the holes in the brackets on the Right Squat
Frame Rail (Item #8) and Left Squat Frame Rail (Item #9)
with the holes in the Seat Support Rail (Item #7) as shown
in
Figure 5
.
Place (1) 3/8" Washer (Item #O) over the end of (1) 3/8" X
5" Hex Head Bolt (Item #I), and slide the bolt through the
upper bolt hole in the Left Squat Frame Rail, Seat Rail and
Right Squat Frame Rail, as shown in
Figure 5
. Place (1)
3/8" Washer (Item #O) and (1) 3/8" Nylock Nut (Item #R)
over the end of the bolt to secure it.
Then, place (2) 3/8" Washers (Item #O) over the ends of
(2) 3/8" X 3/4" Hex Head Bolts (Item #G) and attach the
Squat Frame Rails more securely by screwing these through
the lower holes in the Squat Frame Rails and Seat Rail, as
shown in
Figure 5
.
Next, (see
Figure 5a
) slide the Right Squat Frame Foot
Assembly (Item #10) into the connectors on the Right
Frame Rail (Item #2) and the Right Squat Frame Rail.
Secure the Foot Assembly using (2) 3/8" X 3/4" Hex Head
Bolts (Item #F) and (2) 3/8" Washers (Item #O).
Repeat this process for the Left Squat Frame Foot Assembly
(Item #11).
Note: You will need to lift the machine to install the Squat
Frame Foot Assemblies.
Tighten all hardware from Step 5 only at this time.
Figure 5
I
R
8
9
7
G
O
Figure 5a
8
9
11
10
35
6
34
2
F
O