Cisco 4948-10GE Installation Guide - Page 140

installing the switch, starting the terminal-emulation

Page 140 highlights

Index E electrostatic discharge (ESD) 2-9 EMI recommendations 2-4 environmental requirements 2-1 F fan tray cooling 1-11 failure 1-12 status LED 1-11 fiber-optic connectors 4-7 G grounding requirement, DC systems 2-6 H hardware description power supply 1-12 heat dissipation determining 2-4 I installation connecting to a power source B-3 IN-2 Catalyst 4900 Series Switch Installation Guide starting the terminal-emulation software B-3 installing the switch guidelines 3-2 lifting 3-5 procedure 3-6 safety overview 2-7 tools required 3-5 troubleshooting 5-1 L label, chassis serial number 5-6 LEDs locations 1-9 meanings 1-10 POST results B-4 power supply 5-3 M management port pinout A-2 memory A-3 MT-RJ connectors cleaning 4-6 P pinout management port A-2 78-18039-02

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142

Index
IN-2
Catalyst 4900 Series Switch Installation Guide
78-18039-02
E
electrostatic discharge (ESD)
2-9
EMI recommendations
2-4
environmental requirements
2-1
F
fan tray
cooling
1-11
failure
1-12
status LED
1-11
fiber-optic connectors
4-7
G
grounding requirement, DC systems
2-6
H
hardware description
power supply
1-12
heat dissipation
determining
2-4
I
installation
connecting to a power source
B-3
starting the terminal-emulation
software
B-3
installing the switch
guidelines
3-2
lifting
3-5
procedure
3-6
safety overview
2-7
tools required
3-5
troubleshooting
5-1
L
label, chassis serial number
5-6
LEDs
locations
1-9
meanings
1-10
POST results
B-4
power supply
5-3
M
management port pinout
A-2
memory
A-3
MT-RJ connectors
cleaning
4-6
P
pinout
management port
A-2